Zorro Projects - 5/4/13
Main House - Outside Start End Total Est. Cost Notes
Landscaping - Proposals & Maintenance from 3 companies forwarded to RK &
Rear Planter Bed DI - 3/28/13
Front & Rear Parking Beds 'JE approved 4/27/13, Aspen Landscaping received the contract to
Bowel Garden refurbish.
Aspen Grove New proposal received 5/3/13 will review & forward 5/6/13
Pinion Screen
Landscape Lighting Timers - ;JE approved 4/27/13 to replace Timers
Landscaping - In House - JE approved 4/27/13 to remove existing Ponderosa Pines,
Ponderosa Pines & Landscape Lights at Landscape Lights & to relocate Pinions to the area.
Front Entrance Removal of Dead Pine in Front Courtyard.
CAN WE PROCEED WITH REMOVAL
Terraces - Three B's 4/7/13 $56,200.00 Bid Received 12/12/12 - Approved 3/20/13
Terraces - $52,000.00 Library Terrace Membrane - installed. Stucco to be completed
Stucco/Gutters/Painting - $4,200.00 once MBR Terrence membrane is installed
MBR Terrace Demo complete. Work continues
Stucco Work - Three B's 4/7/13 $36,400.00 'Bid Received 3/1/13 - Approved 3/20/13
Site Walls Wall Stucco Patching & Painting 90% complete
Columns Columns Stucco & Painting 90% complete
Attached Photos
Estancia Fountain - $2,500.00 Bid received 3/1/13
Bowl Lift - $1,220.00 JE approved 4/27/13
Electrical - $880.00 4/29/13 - Brice determined that the leak is the main line going to
Pump - $400.00 the upper bowl. Proposed repair is to isolate leaking line & use
return line to lower bowl, splitting line to feed upper bowl. This
will mean we will continue using existing pump & filter. Will
forward cost 5/9/13
EFTA00624854
Zorro Projects - 5/4/13
Chess Fountain - Requires resurfacing
JE approved 4/27/13
Bid will be forwarded 5/10/13
Ranch Front Gates - Received bid 4/20/13, have requested vendor to make
New Gate Openers adjustments, new bid received 5/3/13, reviewing
JE approved 4/27/13
Main House - Inside Start Total Est. Cost Notes
Cooling Tower - 4/24/13 - RK approved bid from SPX & JBH. RK has all cost details
5/3/13 - Deposit was to be forwarded
Replacement of Pool Pac - 9/11/12
Engineering Inspection - $5,000.00 4/29/13 - Quote forwarded to RK, who requested more detail,
Unit Cost - $43,170.00 will forward once in hand
Ducting - TBA
Re • air of Pool Pac - 3/15/13 Unit working on fan only, proceeding with replacement of Pool
Pac
Repair Pool/Spa - Vendor on site 4/8/13 to review scope of work
Water Sample of Tap Water - 4/27/13 - JE requested water samples be taken.
This will be completed by the end of the coming week once water
system is balanced - Dakota Well/RO went on line 5/3/13
Exterior Doors - JE requested 4/27/13 that all saddles on exterior doors be
adjusted so doors will close correctly. Will be completed once
Terraces etc. complete
Audio Upgrade -
New TV's Installed - final programming required
DVD Players/Theater Upgrade Installed - Programming of remotes required
EFTA00624855
Zorro Projects - 5/4/13
Kitchen Table Electrical - Three B's Bid Received 3/1/13 Lead Time 1 Week
Electrical & Data Cut In - $2,160.00 Need to review design and floor
Media Room - New Curtains/Blackout 2/24/13 JE selected fabric 4/27/13. Amount required has been placed on
hold. 2 companies will be submitting a bid by 5/9/13
Sarah's Office - New Curtains/Lined 2/24/13 JE selected fabric 4/27/13. As of date manufacturer cannot
provide enough yardage, they will forward an update 5/6/13
Gym - Mirrored Doors - Backed/Framed 3 B's completed, JE requested further work, will review with
2/24/13 vendor
IT & Phones Start End Total Ed. Cost Notes
4/27/13 JE approved the installation of new phones at MH
Reviewing new scope of work - Microwave option
Cell Repeaters & WI-Fl Start End Total Bt. Cost Notes
Cell Repeater - Library Will have installed by 5/9/13
Cell Repeater- Gym Will be completed with Audio install
Sound System - Gym Requires refurbishment to accept I Pad
Computers Lap Top - Lodge Desk Top - Office
REQUESTING APPROVAL TO PURCHASE
Well K Start En Total Est. Cost Notes
Plugging First Hole - $15,000.00
Multi Media Filters & Install - $5,844.57 JE approved 4/27/13
Transponder & Install - $1,700.00 5/3/13 - Multi Media Filters ordered
Mis Pipe & Fittings - $1,000.00 5/8/13 - Transponder to be installed
Windows Laptop - $700.00 4/27/13 5/3/13 $620.56 5/3/13 - Laptop purchased
Dakota RO Water Softener Start End Total Ed. Cost Notes
2/18/13 5/3/13 $3,045.45 Complete - Well & RO on line as of 5/3/13
Lodge Start End Total Est. Cost Notes
Roof - Repair/Replace Broken Sections 11 will complete while on site for upcoming projects
EFTA00624856
Zorro Projects - 5/4/13
Log Cabin Start End Total Est. Cost Notes
Step Outside - Repair/Replace 2/24/13 NA
Caboose Start End Total Est. Cost Notes
Outside Wall - Installation of Retaining Wall NA
Yurt Start End Total Est. Cost Notes
Yurt - Replace Walls/Roof/Door/Windows $6,355.00 JE approved 1/12/13.
plus shipping Vendor forwarded quote 5/3/13 - lead time after payment 8 to
charges of 10 weeks.
approx. $480.00 Floor will need to be sanded and resurfaced
REQUESTING APPROVAL FOR 50% DEPOSIT
Flay Barn Start End Total Est. Cost Notes
Paint 4/8/13 NA Work to begin 5/9/13
Greenhouse Start End Total Est. Cost Notes
Paint -Outside 3/24/13 4/29/13 $390.00 Complete
Bunkhouse Start End Total Est. Cost Notes
Paint - Window Frames & Sills 2/24/13 NA Walls completed, working on window frames & sills
Window/Doors - Total Replacement 2/6/12 Will Budget for 2014
Reservoir Start End Total Est. Cost Notes
Paint - Tank 2/24/13 NA Will start once Bunkhouse & Haybam complete
Vehicles Start End Total Est. Cost Notes
2013 Ford Expedition - review Captain Seats 3/27/13 Estimate received 5/2/13 - $11,528.74
to be installed Awaiting 2nd estimate
2008 Dodge Dually -Service/Repair $3,509.55 Complete
M2 Start End Total Est. Cost Notes
JE approved 4/27/13 investigating purchase of 2 dogs.
Researching
EFTA00624857
Zorro Projects - 5/4/13
Purchases
White Rug - Gym (10 x 12) JE approved 4/27/13 to move ahead with Robert's Flooring to
manufacture a rug using carpet. Estimate expected 5/10/13
Big Urns - Outside MH JE approved 3/27/13 - Terre Cotto
Outside Pool Furniture
Large Chrome Pool Clock
Facial Machine Sue & Karyna to purchase
EFTA00624858
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 190f7a54-39fc-437a-9afb-b0dcc8aa7035
- Storage Key
- dataset_9/EFTA00624854.pdf
- Content Hash
- 7fbbebfc5c4265b65ab86010a57a2c47
- Created
- Feb 3, 2026