Epstein Files

EFTA01010179.pdf

dataset_9 pdf 260.0 KB Feb 3, 2026 4 pages
From: J <jeevacation@gmail.com> To: michael glidden < >, Richard Kahn Subject: Re: On going work list Date: Fri, 28 Dec 2018 19:12:59 +0000 I thought air con chitin was to be finished last week. 2 do the genarators now work, you were going to get the fuel parts 2 weeks ago. On Fri, Dec 28, 2018 at 11:17 AM michael glidden < > wrote: Good day, I apologize for the delay. 1. Palm tree lighting. On going. 2. Courtyard lighting. On going 3. Landscape lighting at Master bedroom stairs. Completed 4. Pool cabana kitchen electric. On going 5. Main compound cabanas, electric and lighting. Completed 6. Chillax a/c renovation, chandelier removal and lighting. A/c on going, chandelier and new lighting completed 7. Dock electric, lighting, under water lighting and wifi. On going 8. Camera at staff cottage for dock. Pending 9. Cistern drains for main compound. Pending 10. WAPA switch replacement. Completed 11. Install ducbank/trench from generator bldg to tunnel for future electric feed to GSJ & fiber run for desal controls. On going 12. Install movie room ceiling speakers and amps. Temp completed. Awaiting permanent speakers 13. Replace all recessed lights at pool gazebo structures completed 14. Repair 2nd pool heater at flag pole pool new unit just arrived, pending 15. Repair/refurbish both fuel dispensers pending 16. Complete trouble shooting/repair Diesal pump feeding dispenser on going 17. Install new water distribution pump system for LSJ. All equipment now on island, pending 18. Refurbish water distribution manifold pending 19. Install new sewage lift/mascerating pump for LSJ staff cottage and piping to treatment plant. Pump on island, pending 20. Address water heating issue at staff cottage pending 21. LSJ tiki kitchen remodel electric and plumbing ongoing 22. Blue Beach cottage transformer replacement next job for dock electrician, pending 23. Electric and data to 5 palms. Material out to bid, Charles Electric to look at job after 1-2-19 24. Electrical conduit work at tower antenna. Pending 25. Solar system and electrical at Pebble Beach cottage. New roof complete, needs to be painted/sealed, pending 26. Power to beach for captains. Pending 27. Larger filter for sea water intake at library/beach well. Pending 28. Refurbish fire suppression system in generator building. Pending 29. Fuel truck rehab per survey. Truck to be replaced, two quotes forthcoming 30. Generator fuel system refurbishment. Pending 31. Replacement of electric panels in both pool pump rooms. Pending 32. Electric out to new waterfall area. Pending. 33. Replace all exterior light trims to white due to rust on going 34. Replace all exterior switch and outlet covers due to corrosion. On going 35. Staff cottage dryer to be changed to propane jetting. Pending 36. Install lighting for library statues. Pending EFTA01010179 37. Install new awnings at both pool gazebo structures. Awaiting awnings, pending 38. Install two new sewage treatment plants on GSJ. On going 39. Wire new generators on GSJ. On going 40. Install new flagpole lights on GSJ. Completed 41. Replace water distribution pump on GSJ. Completed 42. Install electric and plumbing in new tiki hut on GSJ. On going 43. Batteries to be replaced in GSJ solar system. Pending 44. Daily managing of barge schedule. On going 45. Research and order maintenance/repair parts. On going 46. Daily maintenance of electrical and plumbing systems for both islands. On going 47. On going installation and refurbishment of landscape lighting island wide. On going 48. Coordinate barge maintenance/refurbishment work. Pending 49. Coordinate with local architects for future services. On going search for one 50. Daily issues that cannot be anticipated or avoided. On going On Dec 21, 2018, at 6:16 PM, Richard Kahn < > wrote: Mike Can you please update your punch list with the following descriptions: a) completed b) scheduled c) open Additionally have you completed Spec List to give out to Electricians.. Did Charles Electric come out this week? If not please schedule them to review appropriate work next week.. I sent Kyle their contact info earlier this week.. In case you never received: 340-998-8066 340-714-8066 Thank you Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 On Dec 1, 2018, at 10:18 AM, Michael Glidden < > wrote: EFTA01010180 I. Palm tree lighting 2. Courtyard lighting 3. Landscape lighting at Master bedroom stairs 4. Pool cabana kitchen electric 5. Main compound cabanas, electric and lighting 6. Chillax a/c renovation, chandelier removal and lighting 7. Dock electric, lighting, under water lighting and wifi 8. Camera at staff cottage for dock 9. Cistern drains for main compound 10. WAPA switch replacement 11. Install ducbank/trench from generator bldg to tunnel for future electric feed to GSJ & fiber run for cical controls 12. Install movie room ceiling speakers and amps 13. Replace all recessed lights at pool gazebo structures 14. Repair 2nd pool heater at flag pole pool 15. Repair/refurbish both fuel dispensers 16. Complete trouble shooting/repair Diesal pump feeding dispenser 17. Install new water distribution pump system for LSJ 18. Refurbish water distribution manifold 19. Install new sewage lift/mascerating pump for LSJ staff cottage and piping to treatment plant 20. Address water heating issue at staff cottage 21. LSJ tiki kitchen remodel electric and plumbing 22. Blue Beach cottage transformer replacement 23. Electric and data to 5 palms 24. Electrical conduit work at tower antenna 25. Solar system and electrical at Pebble Beach cottage 26. Power to beach for captains 27. Larger filter for sea water intake at library/beach well 28. Refurbish fire suppression system in generator building 29. Fuel truck rehab per survey 30. Generator fuel system refurbishment 31. Replacement of electric panels in both pool pump rooms 32. Electric out to new waterfall area 33. Replace all exterior light trims to white due to rust 34. Replace all exterior switch and outlet covers due to corrosion 35. Staff cottage dryer to be changed to propane jetting 36. Install lighting for library statues 37. Install new awnings at both pool gazebo structures 38. Install two new sewage treatment plants on GSJ 39. Wire new generators on GSJ 40. Install new flagpole lights on GSJ 41. Replace water distribution pump on GSJ 42. Install electric and plumbing in new tiki hut on GSJ 43. Batteries to be replaced in GSJ solar system 44. Daily managing of barge schedule 45. Research and order maintenance/repair parts 46. Daily maintenance of electrical and plumbing systems for both islands 47. On going installation and refurbishment of landscape lighting island wide 48. Coordinate barge maintenance/refurbishment work 49. Coordinate with local architects for future services 50. Daily issues that cannot be anticipated or avoided That would be all for now. EFTA01010181 please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA01010182

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
1627abf1-917c-4c72-a29c-54574d44e581
Storage Key
dataset_9/EFTA01010179.pdf
Content Hash
6344b9aa3dbbf186bd9c8c6b283e771b
Created
Feb 3, 2026