From: J <jeevacation@gmail.com>
To: michael glidden < >, Richard Kahn
Subject: Re: On going work list
Date: Fri, 28 Dec 2018 19:12:59 +0000
I thought air con chitin was to be finished last week. 2 do the genarators now work, you were going to get the
fuel parts 2 weeks ago.
On Fri, Dec 28, 2018 at 11:17 AM michael glidden < > wrote:
Good day, I apologize for the delay.
1. Palm tree lighting. On going.
2. Courtyard lighting. On going
3. Landscape lighting at Master bedroom stairs. Completed
4. Pool cabana kitchen electric. On going
5. Main compound cabanas, electric and lighting. Completed
6. Chillax a/c renovation, chandelier removal and lighting. A/c on going, chandelier and new lighting
completed
7. Dock electric, lighting, under water lighting and wifi. On going
8. Camera at staff cottage for dock. Pending
9. Cistern drains for main compound. Pending
10. WAPA switch replacement. Completed
11. Install ducbank/trench from generator bldg to tunnel for future electric feed to GSJ & fiber run for desal
controls. On going
12. Install movie room ceiling speakers and amps. Temp completed. Awaiting permanent speakers
13. Replace all recessed lights at pool gazebo structures completed
14. Repair 2nd pool heater at flag pole pool new unit just arrived, pending
15. Repair/refurbish both fuel dispensers pending
16. Complete trouble shooting/repair Diesal pump feeding dispenser on going
17. Install new water distribution pump system for LSJ. All equipment now on island, pending
18. Refurbish water distribution manifold pending
19. Install new sewage lift/mascerating pump for LSJ staff cottage and piping to treatment plant. Pump on
island, pending
20. Address water heating issue at staff cottage pending
21. LSJ tiki kitchen remodel electric and plumbing ongoing
22. Blue Beach cottage transformer replacement next job for dock electrician, pending
23. Electric and data to 5 palms. Material out to bid, Charles Electric to look at job after 1-2-19
24. Electrical conduit work at tower antenna. Pending
25. Solar system and electrical at Pebble Beach cottage. New roof complete, needs to be painted/sealed,
pending
26. Power to beach for captains. Pending
27. Larger filter for sea water intake at library/beach well. Pending
28. Refurbish fire suppression system in generator building. Pending
29. Fuel truck rehab per survey. Truck to be replaced, two quotes forthcoming
30. Generator fuel system refurbishment. Pending
31. Replacement of electric panels in both pool pump rooms. Pending
32. Electric out to new waterfall area. Pending.
33. Replace all exterior light trims to white due to rust on going
34. Replace all exterior switch and outlet covers due to corrosion. On going
35. Staff cottage dryer to be changed to propane jetting. Pending
36. Install lighting for library statues. Pending
EFTA01010179
37. Install new awnings at both pool gazebo structures. Awaiting awnings, pending
38. Install two new sewage treatment plants on GSJ. On going
39. Wire new generators on GSJ. On going
40. Install new flagpole lights on GSJ. Completed
41. Replace water distribution pump on GSJ. Completed
42. Install electric and plumbing in new tiki hut on GSJ. On going
43. Batteries to be replaced in GSJ solar system. Pending
44. Daily managing of barge schedule. On going
45. Research and order maintenance/repair parts. On going
46. Daily maintenance of electrical and plumbing systems for both islands. On going
47. On going installation and refurbishment of landscape lighting island wide. On going
48. Coordinate barge maintenance/refurbishment work. Pending
49. Coordinate with local architects for future services. On going search for one
50. Daily issues that cannot be anticipated or avoided. On going
On Dec 21, 2018, at 6:16 PM, Richard Kahn < > wrote:
Mike
Can you please update your punch list with the following descriptions:
a) completed
b) scheduled
c) open
Additionally have you completed Spec List to give out to Electricians..
Did Charles Electric come out this week? If not please schedule them to review appropriate work next
week..
I sent Kyle their contact info earlier this week..
In case you never received:
340-998-8066
340-714-8066
Thank you
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
On Dec 1, 2018, at 10:18 AM, Michael Glidden < > wrote:
EFTA01010180
I. Palm tree lighting
2. Courtyard lighting
3. Landscape lighting at Master bedroom stairs
4. Pool cabana kitchen electric
5. Main compound cabanas, electric and lighting
6. Chillax a/c renovation, chandelier removal and lighting
7. Dock electric, lighting, under water lighting and wifi
8. Camera at staff cottage for dock
9. Cistern drains for main compound
10. WAPA switch replacement
11. Install ducbank/trench from generator bldg to tunnel for future electric feed to GSJ & fiber run for cical
controls
12. Install movie room ceiling speakers and amps
13. Replace all recessed lights at pool gazebo structures
14. Repair 2nd pool heater at flag pole pool
15. Repair/refurbish both fuel dispensers
16. Complete trouble shooting/repair Diesal pump feeding dispenser
17. Install new water distribution pump system for LSJ
18. Refurbish water distribution manifold
19. Install new sewage lift/mascerating pump for LSJ staff cottage and piping to treatment plant
20. Address water heating issue at staff cottage
21. LSJ tiki kitchen remodel electric and plumbing
22. Blue Beach cottage transformer replacement
23. Electric and data to 5 palms
24. Electrical conduit work at tower antenna
25. Solar system and electrical at Pebble Beach cottage
26. Power to beach for captains
27. Larger filter for sea water intake at library/beach well
28. Refurbish fire suppression system in generator building
29. Fuel truck rehab per survey
30. Generator fuel system refurbishment
31. Replacement of electric panels in both pool pump rooms
32. Electric out to new waterfall area
33. Replace all exterior light trims to white due to rust
34. Replace all exterior switch and outlet covers due to corrosion
35. Staff cottage dryer to be changed to propane jetting
36. Install lighting for library statues
37. Install new awnings at both pool gazebo structures
38. Install two new sewage treatment plants on GSJ
39. Wire new generators on GSJ
40. Install new flagpole lights on GSJ
41. Replace water distribution pump on GSJ
42. Install electric and plumbing in new tiki hut on GSJ
43. Batteries to be replaced in GSJ solar system
44. Daily managing of barge schedule
45. Research and order maintenance/repair parts
46. Daily maintenance of electrical and plumbing systems for both islands
47. On going installation and refurbishment of landscape lighting island wide
48. Coordinate barge maintenance/refurbishment work
49. Coordinate with local architects for future services
50. Daily issues that cannot be anticipated or avoided
That would be all for now.
EFTA01010181
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01010182
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 1627abf1-917c-4c72-a29c-54574d44e581
- Storage Key
- dataset_9/EFTA01010179.pdf
- Content Hash
- 6344b9aa3dbbf186bd9c8c6b283e771b
- Created
- Feb 3, 2026