EFTA00887877.pdf
dataset_9 pdf 100.0 KB • Feb 3, 2026 • 2 pages
From: Jeffrey Epstein <jeevacation@gmail.com>
To: Stephen Caplinger
Subject: Re: LSJ
Date: Sat, 26 Dec 2009 16:53:38 +0000
the sketch up was the first time i could see how disorganized the elevations were. my fault.
On Sat, Dec 26, 2009 at 10:31 AM, Stephen Caplinger < > wrote:
-------- Forwarded message
From: Stephen Caplinger <
Date: Sat, Dec 26, 2009 at 8:45 AM
Subject: LSJ
Jeffrey:
It greatly concerns me that you are disappointed so I wanted to address your concerns. In regard to the Office
Pavilion entry landscaaping, We proceeded to construction only because we felt that we had you approval.
I felt that we had your approval and go ahead after we submitted the final design plans which were based
on several preliminary concept plan submittals. You even made the comment that we don't need to show you
the plans again and we should consider it approved for construction.
I want to assure you that I would never proceed to construction on anything without first having your approval.
On the Kite House, I know you like to see photo overlay sketches, but all we've done is conceptual floor plans
& site plans. As soon as I can I'll prepare additional photo sketches for your review on the exterior views &
orientation.
Going forward, I want to make absolutely sure that you are happy with what we are doing and that you feel
that we've given you enough design information to make decisions.
I would hope that we we will be able to walk through with you the various designs when we are together with
Gary on LSJ. I believe that we can better communicate in person and on site.
In the future, I will strive to give you better design concepts that are on photo overlays and to send hard
copiesin addition to email attachements. I plan on being back on LSJ during the week of 1/4/10 - 1/8/10 so we
should definitely get together to walk through all of the landscape issues so that I am totally clear on your
vision. I don't have any doubt that we can produce your vision on the island, I just feel we have a
communication issue.
Meanwhile, I am working on the Coastal Zone Management application package for the Kite House Pool,
Wood Deck, Fire Pit, ATV Garage and the Tennis Court. We also plan on discussing the Boat Dock House but
this is more of a Corps of Engineers issue. All of the designs in the CZM submittal can be revised later.
Please call me if you have any comments or questions and I look forward to seeing you.
Ste hen M. Ca linger
Ste hen M. Ca linger
EFTA00887877
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments.
EFTA00887878
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 158eb649-1e90-43d1-8b5d-8fa1a5b4dc0d
- Storage Key
- dataset_9/EFTA00887877.pdf
- Content Hash
- 876777420afe5de281ac7dfa791ebbd1
- Created
- Feb 3, 2026