EFTA00612596 LSJ Pro ects Estimated Cost ES ANC RO Shed $205,705.00 121,440.00 tity)J6k Engineering Shed ' 5327,800.00 268,180.00 RO Refurbishment $ 60,693.00 , t Switch Gear Refurbishment $ 18,500.00 Tunnel Lights Lights x 40 S 2,621.13 Labor $ 4,400.00 $ 7,021.13 Awning $ 38,130.00 Chiles Window TBA Flashing Great Room induded In Cottage Bid Little C Refurbishment Paint 16,500.00 Haul Out 1,935.00 Hardware $ 200.00 t S Bench Seat i 800.00 I Water Taxi Total i $ 19,435.00 EFTA00612597 install Variable Speed Drives Main Distribution Pumps TBA ! Low Level Cut Offs Main Distribution 1 Pumps TBA Pool Filters $ 2,446.95 LSI Projects Staff Cottage Refurbishnment Material $ 45,000.00 Labor $ 30,000.E Appliances S 10,534.05 Staff Cottage Furniture $ 17,965.00 !$ 103,499.05 Total Purchase New HD Truck 52,000.00 ' Accessories TBA 651 Hell Pad $ 16,445.00 Quonset Hut A I Hut and Hell Pad 58,000.00 i Quonset Hut 8 40,465.48 $ 54,740.00 !Both Huts no EX I Staff Cottage Kitchen and Appliances ' $ 8,832.95 EFTA00612598 Staff Cottage Furniture $ 7,047.96 It I Electrical, Plumbing and Walls 3,250.00 i$ Labor i In House $ 15,860.91 EFTA00612599 4. SCHEDULE The entire project described in this proposal will be completed within 3 months following execution of a contract between the parties. 5. PRICING & PAYMENT TERMS The project will be undertaken at a price of $9,9rn.00 for labor and materials with the exception of the sheds. The sheds from Buck Steel will be purchased by Little St James who will also Day for all shipoina costs from factory to iob site. Scope Of Work I Labor Price GENERAL REQUIREMENTS a. General Conditions TBD b. Shipping, Port Fees & Handling of Buck Steel order paid by LSJ SITE EXCAVATION & EARTHWORK $ 63,000 a. Earth change protection barricades/silt fencing $ 2,500 $ 1,500 b. Site hand clearing and excavation c. Site and foundation footing pads excavation $ 1,500 d. Backfilling and compaction $ 3,500 e. Subterranean termite treatment $ 1,200 f. Site retaining walls (two areas) $ 40,000 g. Extended exterior walkway along R.O building A $ 8,500 h. Seeding / restoration of disturbed areas $ 1,800 i. Trucking & disposal of spoils $ 2,500 NEW STORAGE BUILDING CONSTRUCTION *W00 + a. First floor fittings & foundation walls $ 23,400 Nact EC b. Enkadrain drainage matt & bituminous coating 4,500 Cg gLa c. New gravel encased 4" - PVC drain pipes $ 2,000 d. First floor concrete bottom salb and entry landing $ 18,750 e. First floor exterior & interior concrete walls $ 32,000 f. First floor concrete column pads and columns $ 7.500 g. First floor concrete beams $ 15,500 h. Concrete roof slab $ 31,000 i. Concrete parapet wall w/ cap flashing $ 5,250 j. Single-ply membrane at parapet and roof $ 2,500 EFTA00612600 NEW STORAGE BUILDING CONSTRUCTION, cont. k. 6" compacted earth fill topping on roof $ 7,500 I. Doors package complete $ 3,500 m. Electrical complete (fixtures, wiring, installation) 5 20,000 TBD n. Mecahnical exhaust fans and louvers complete o. Painting of first floor walls $ 1,500 R.O. BUILDING A $ 111,750 + a. First floor excavation for pier footings NAN ) 16° $ 3,500 b. First floor spread footings and foundations $ 9,000 c. First floor concrete columns and piers $ 6,500 d. Second floor perimeter grade beams under new slab $ 8,750 e. Second floor building extended elevated concrete slab $ 28,000 f. Second floor pre-engineered building package complete Purchsed by LSJ $ 30,000 g. Second floor pre-engineered building erection complete h. Second floor roll-up doors package complete $ 15,000 i. Second floor electrical complete (Fixtures, panels and installation) 9,000 j. Seconf loor mechanical (exhaust fans and louvers) TBD k. Second floor miscellaneous wall painting $ 2,000 GENERATOR BUILDING B $ 30,400 + a. Second floor pre-engineered building package complete P y LSJ b. Second floor pre-engineered building erection $ 12,000 c. Second floor roll-up doors pack ete $ 12.500 d. Second floor electri p ete (Fixtures, panels and instalattion) $ 5,000 e. Seco chanical (exhaust fans and louvers) TBD econd floor miscellaneous wall painting S 900 TOTAL OF ALL CATEGORIES OF WORK ABOVE CONTINGENCY (15%) GRAND TOTAL • Payment schedule/terms are as follows: • EFTA00612601 Generator/Mechanical & R.O. Buildings Construction Proposal March 9, 2017 Prepared for: Great St. James & Little St. James Red Hook Quarters. St. Thomas. VI Contact: Brice Gordon Prepared by: SSVI-Expert Builders 6501 Red Hook Plaza, Ste 201 St. Thomas VI 00802 (340) 776-4000 Contact: Alex Crawfordlaccounting@viexpertbuilders.com EFTA00612602 1. INTRODUCTION 2. ABOUT SSVI 3. SCOPE OF WORK 4. SCHEDULE 5. PRICING & PAYMENT TERMS 6. GENERAL TERMS & CONDITIONS 7. ASSUMPTIONS SSVI is pleased to submit this construction proposal to LSJ do Brice Gordon to be performed at the property located at Little St. James,USVI. By the signature of SSVI's authorized representative set forth below, SSVI agrees to be bound by the representations made herein. This construction proposal and the pricing provided herein shall remain valid for a period of 60 days following the date shown on page 1. 1. INTRODUCTION Little St. James desires to have the existing Generator/Mechanical & R.O buildings removed and replaced with new structures and has provided a general specification and has communicated a set of requirements, which are summarized as follows: • Site Excavation & Earthwork • New Storage Building Construction • R.O Building (A) • Generator Building (B) SSVI / Expert is confident that it will present the best value forLittle St James. First, our past performance record to meet schedules and deliver a high-quality product, at a relatively low cost as compared with the competition. Second, our extensive expertise in this area allows us to tackle tough projects on a fixed-price basis, thereby alleviating any concern that the price may increase. Third, the talent level of our team is unparalleled and our project management practices ensure labor efficiencies that drive costs down. Finally, our access to the highest quality materials at highly competitive prices ensures the lowest possible cost of goods. EFTA00612603 2. ABOUT SSVI SSVI is an established and well-respected local contractor that has been serving customers in The Virgin Islands since 2009. SSVI has completed a broad range of construction projects over the years, and many of them have been of comparable scope and magnitude as compared with this construction project. SSVI is supported by an extraordinary team of professionals who are highly skilled in their trade. For this project, the team will be lead by Reynolds Clement. Reynolds Clement has a proven track record of successfully leading projects such as this. 3. SCOPE OF WORK SSVI will perform all construction activities associated withthe new buildings on Little St James. Such work will be carried out in accordance with requirements communicated to SSVI by Little St James in this proposal and the architectural plans provided by the Jaredian Design Group. In addition to the responsibilities of SSVI outlined in such document, SSVI will be responsible for the following: • Site Excavation & Earthwork • New Storage Building Construction • Construction of the R.O Building and the Generator Building • Site Cleanup

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
15428760-adf1-4e28-842a-70538bdec45a
Storage Key
dataset_9/EFTA00612596.pdf
Content Hash
a730b9c282bac26af206e252d498944a
Created
Feb 3, 2026