LSJ Pro ects Estimated Cost ES ANC
RO Shed $205,705.00 121,440.00
tity)J6k
Engineering Shed ' 5327,800.00 268,180.00
RO Refurbishment $ 60,693.00 ,
t
Switch Gear Refurbishment $ 18,500.00
Tunnel Lights
Lights x 40 S 2,621.13
Labor $ 4,400.00
$ 7,021.13
Awning $ 38,130.00
Chiles Window TBA
Flashing Great Room induded In Cottage Bid
Little C Refurbishment
Paint 16,500.00
Haul Out 1,935.00
Hardware $ 200.00
t S
Bench Seat i 800.00 I
Water Taxi
Total i $ 19,435.00
EFTA00612597
install Variable Speed Drives Main
Distribution Pumps TBA
!
Low Level Cut Offs Main Distribution 1
Pumps TBA
Pool Filters $ 2,446.95
LSI Projects
Staff Cottage Refurbishnment
Material $ 45,000.00
Labor $ 30,000.E
Appliances S 10,534.05
Staff Cottage Furniture $ 17,965.00
!$ 103,499.05
Total
Purchase New HD Truck 52,000.00 '
Accessories TBA
651
Hell Pad $ 16,445.00
Quonset Hut A I Hut and Hell Pad 58,000.00
i
Quonset Hut 8 40,465.48 $ 54,740.00 !Both Huts no EX
I
Staff Cottage Kitchen and Appliances ' $ 8,832.95
EFTA00612598
Staff Cottage Furniture $ 7,047.96
It I
Electrical, Plumbing and Walls 3,250.00
i$
Labor i In House
$ 15,860.91
EFTA00612599
4. SCHEDULE
The entire project described in this proposal will be completed within 3 months following
execution of a contract between the parties.
5. PRICING & PAYMENT TERMS
The project will be undertaken at a price of $9,9rn.00 for labor and materials with the
exception of the sheds. The sheds from Buck Steel will be purchased by Little St James
who will also Day for all shipoina costs from factory to iob site.
Scope Of Work I Labor Price
GENERAL REQUIREMENTS
a. General Conditions TBD
b. Shipping, Port Fees & Handling of Buck Steel order paid by LSJ
SITE EXCAVATION & EARTHWORK $ 63,000
a. Earth change protection barricades/silt fencing $ 2,500
$ 1,500
b. Site hand clearing and excavation
c. Site and foundation footing pads excavation $ 1,500
d. Backfilling and compaction $ 3,500
e. Subterranean termite treatment $ 1,200
f. Site retaining walls (two areas) $ 40,000
g. Extended exterior walkway along R.O building A $ 8,500
h. Seeding / restoration of disturbed areas $ 1,800
i. Trucking & disposal of spoils $ 2,500
NEW STORAGE BUILDING CONSTRUCTION *W00 +
a. First floor fittings & foundation walls $ 23,400 Nact EC
b. Enkadrain drainage matt & bituminous coating 4,500 Cg gLa
c. New gravel encased 4" - PVC drain pipes $ 2,000
d. First floor concrete bottom salb and entry landing $ 18,750
e. First floor exterior & interior concrete walls $ 32,000
f. First floor concrete column pads and columns $ 7.500
g. First floor concrete beams $ 15,500
h. Concrete roof slab $ 31,000
i. Concrete parapet wall w/ cap flashing $ 5,250
j. Single-ply membrane at parapet and roof $ 2,500
EFTA00612600
NEW STORAGE BUILDING CONSTRUCTION, cont.
k. 6" compacted earth fill topping on roof $ 7,500
I. Doors package complete $ 3,500
m. Electrical complete (fixtures, wiring, installation) 5 20,000
TBD
n. Mecahnical exhaust fans and louvers complete
o. Painting of first floor walls $ 1,500
R.O. BUILDING A $ 111,750 +
a. First floor excavation for pier footings
NAN ) 16° $ 3,500
b. First floor spread footings and foundations $ 9,000
c. First floor concrete columns and piers $ 6,500
d. Second floor perimeter grade beams under new slab $ 8,750
e. Second floor building extended elevated concrete slab $ 28,000
f. Second floor pre-engineered building package complete Purchsed by LSJ
$ 30,000
g. Second floor pre-engineered building erection complete
h. Second floor roll-up doors package complete $ 15,000
i. Second floor electrical complete (Fixtures, panels and installation) 9,000
j. Seconf loor mechanical (exhaust fans and louvers) TBD
k. Second floor miscellaneous wall painting $ 2,000
GENERATOR BUILDING B $ 30,400 +
a. Second floor pre-engineered building package complete P y LSJ
b. Second floor pre-engineered building erection $ 12,000
c. Second floor roll-up doors pack ete $ 12.500
d. Second floor electri p ete (Fixtures, panels and instalattion) $ 5,000
e. Seco chanical (exhaust fans and louvers) TBD
econd floor miscellaneous wall painting S 900
TOTAL OF ALL CATEGORIES OF WORK ABOVE
CONTINGENCY (15%)
GRAND TOTAL
• Payment schedule/terms are as follows:
•
EFTA00612601
Generator/Mechanical
& R.O. Buildings
Construction Proposal
March 9, 2017
Prepared for:
Great St. James & Little St. James
Red Hook Quarters. St. Thomas. VI
Contact: Brice Gordon
Prepared by:
SSVI-Expert Builders
6501 Red Hook Plaza, Ste 201
St. Thomas VI 00802
(340) 776-4000
Contact: Alex Crawfordlaccounting@viexpertbuilders.com
EFTA00612602
1. INTRODUCTION
2. ABOUT SSVI
3. SCOPE OF WORK
4. SCHEDULE
5. PRICING & PAYMENT TERMS
6. GENERAL TERMS & CONDITIONS
7. ASSUMPTIONS
SSVI is pleased to submit this construction proposal to LSJ do Brice Gordon to be performed at
the property located at Little St. James,USVI.
By the signature of SSVI's authorized representative set forth below, SSVI agrees to be bound
by the representations made herein.
This construction proposal and the pricing provided herein shall remain valid for a period
of 60 days following the date shown on page 1.
1. INTRODUCTION
Little St. James desires to have the existing Generator/Mechanical & R.O buildings removed
and replaced with new structures and has provided a general specification and has
communicated a set of requirements, which are summarized as follows:
• Site Excavation & Earthwork
• New Storage Building Construction
• R.O Building (A)
• Generator Building (B)
SSVI / Expert is confident that it will present the best value forLittle St James. First, our past
performance record to meet schedules and deliver a high-quality product, at a relatively low
cost as compared with the competition. Second, our extensive expertise in this area allows
us to tackle tough projects on a fixed-price basis, thereby alleviating any concern that the
price may increase. Third, the talent level of our team is unparalleled and our project
management practices ensure labor efficiencies that drive costs down. Finally, our access
to the highest quality materials at highly competitive prices ensures the lowest possible cost
of goods.
EFTA00612603
2. ABOUT SSVI
SSVI is an established and well-respected local contractor that has been serving customers
in The Virgin Islands since 2009. SSVI has completed a broad range of construction projects
over the years, and many of them have been of comparable scope and magnitude as
compared with this construction project.
SSVI is supported by an extraordinary team of professionals who are highly skilled in their
trade. For this project, the team will be lead by Reynolds Clement. Reynolds Clement has a
proven track record of successfully leading projects such as this.
3. SCOPE OF WORK
SSVI will perform all construction activities associated withthe new buildings on Little St
James. Such work will be carried out in accordance with requirements communicated to
SSVI by Little St James in this proposal and the architectural plans provided by the
Jaredian Design Group. In addition to the responsibilities of SSVI outlined in such document,
SSVI will be responsible for the following:
• Site Excavation & Earthwork
• New Storage Building Construction
• Construction of the R.O Building and the Generator
Building
• Site Cleanup
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 15428760-adf1-4e28-842a-70538bdec45a
- Storage Key
- dataset_9/EFTA00612596.pdf
- Content Hash
- a730b9c282bac26af206e252d498944a
- Created
- Feb 3, 2026