EFTA00809744.pdf
dataset_9 pdf 85.3 KB • Feb 3, 2026 • 1 pages
Quotation / Contract
reS
dir Inteersastformal
Glummer. The Saint James Group Job Name; GYM
USVI leaden: SI Croix. USVI
Tel: (340) 201-9533 Quote Date; 1-Aug-18
Email: EGS Quore/Conuaa NA: 18-11019
Mark Unit
No. Ouant.
Atm: &iceGORDON
EQS
Series No.
Unit
Width
Unit
Height
Unit Screen Design Pres.
Config Request PosNeg
Unit
Finish
Glass
Type
Unit
Price
L Extended
Price
1 3 LMI130 72 96 OX OR XO See ADD 40-135 BRNZ KYNM 9,16" Bronze:Bronze (.090" PVB HS'HS) $4.216.96 $12.650.88
2 5 R-LMI5501 35 1a1 61 O NA .101X-100 BRNZ KYNM 9,16" Bronze:Bronze (.090" PVB HS'HS) $1.265.99 $6.329.95
8 TOTAL UNITS
Tote Material Price: $18.980.83
Pricelncludes: Sklar= Export
1 EGS "Classic Series "Oil Rubbed Bronze handles with interior tomb turn. Sur- Tax:
2 Blue Max Film Protection to be applied by EQS Delivery Fear
a Button covers or jamb covers for exposed fasteners as per Installation Instructions Total Quotation,' Contract Price' $18.980.83
4 Stainless steel Assembly screws, stainless steel wheels, stainless steel lock assembly
a 2151O Clear Anodize (Class 1) finish Sill Tracks.
¢ PPG Duranar (70% Kynar) AAMA 2-605 finish
j To be bubble wrapped & cart board. HINIlmflujusL 59A00A2
8 Delivery to Medley. El Balance due on Delivery: $9.490.42
Price Excludes:
1 Retention 10 Water stop angle or water bar
2 Shop drawings, engineering calculations II Replacement glass
3 Installation fasteners. grout or shims 12 Silicone to seal frame corners
4 Perimeter sealant material 13 Screen ADD : $260.00 per screen when ordered with SGD or
5 Blue Max film protection $460.00 per screen when ordered at a later date.
6 Bituminous paint application
7 Special warrantyfEGS standard warranties apply)
8 Field testing
9 Receptor
Please indicate Sill Riser Hgt.: Please Indicate Finish for Classic Series Handles:
X 2 1,2" Sill Riser Ht.(See NOA for Spec Use) Bright Brass (PVD Coat)
3 3/4" Sill Riser Ht4•430 PSF Max) Brushed Nickel (PVD Coat)
415116" Sill Riser Ht4+130 PSF Max) X Oil Rubbed Bronze
Current Delivery Time from receipt of confirmed order & Deposit Check: ti-S WEEKS
Prices subject to change If not accepted within thirty days. Please call EQS to confirm quotation after the thirty (30)day period. The installation as provided by others shall be
In accordance with EGS International LLC Product Approvals (Miami Dade & Florida 2017) and EQS Installation Manual. EQS International LLC takes no resposibility to verify
that design pressure requirements of the products listed above meet the requirements of the customers application. This proposal is subject to EQS International LLC
Standard Terms & Condtions as enclosed. We solicit your early acceptance of this proposal in which event we promise to give the work our most careful attention.
Accepted By:
The Saint lames Group EGS International LLC
By Dated: By: Dated:
ICustomer supplied design preasure requirements in request for quotation.
X No design pressure were supplied to EGS International 1.1.0 ( EGS )1n request for quotation. WS
cautions customer to check project design pressure requirements prior to pricing to your customer.
since additional reinforcement or different glass interlayer requirements might need to he incurred
which will result in additional cost increase.
All above frame sizes are final sizes. by customer accepting contract . customer has reviewed all information and accepts all frame sizes. glass tint. panel
confiquations and panel slides as shown above. Any changes alter acceptance of contract will incur additional charges and will delay shipment of product.
• • Pembroke Park , Fl 33009 • Fax •
EFTA00809744
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 14415fa7-1d1b-40fd-ab40-e6f666f05a1f
- Storage Key
- dataset_9/EFTA00809744.pdf
- Content Hash
- 448cc9ff1a5d71fee228fe1c087615c2
- Created
- Feb 3, 2026