EFTA00578147.pdf
dataset_9 pdf 575.0 KB • Feb 3, 2026 • 12 pages
ESTATE PROGRESS REPORT — September 26, 2003
71" STREET
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Jean Jean to be at 7P' St Oct 1 at 2PM & spend remainder of day there.
51h Floor 1. GM study to be redecorated. GM would like a very simple Pinto - Jean
white room — GM asked Jean to come up with a simple scheme.
2. JE wants 56 floor staff room to be repainted. Doug has been
informed.
3. Lynn & Jojo are to move into the basement — JE to advise if 5th JE
floor is to become guest rooms, if it is to be decorated by Pinto & if
the old carpets (bathroom etc) are to be used for that area?
JE to see room & advise on return to NY.
6'h Floor Round table: is in the process of being restored. Expected J Burdine 10/10
completion by Oct 10.
Ceiling Speakers Speakers to be installed in MBR & MBR Sitting Room. Doug has Doug
organized to have speaker wire installed.
Dining Room 1. Table-top: Brian Kelly is storing new rectangular table-top in
his shop until after construction phase.
2. Lighting: JE approved two chandeliers instead of spotlights.
3. Carpet: JE approved green-striped carpet. Pinto - Jean
Entry Hall 1. Entry hall door: door location to be changed.
(Doug has been reminded of electric and security.)
2. Entry hall marble floor: JE advised to keep marble floor. Doug
Dou to meet with 3 floor contractors for ricin .
EFTA00578147
ESTATE PROGRESS REPORT — September 26, 2003
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Kitchen Service The floor should be changed as it is peeling & the walls repainted. Pinto - Jean
Corridor Jean to advise color on next visit to NY.
MBath 1. MBath carpet: border of original carpet to be left & Jean to Pinto — Jean
provide new insert. JE chose blue & white carpet.
2. Ceiling: men minus their parts approved. Scheduled to begin Pinto - Jean
beginning of Oct.
3. JE approved a bed, & little table: Pinto to purchase. Pinto
MBR Windows: to be further sound-proofed. Acoustical co. selected. Doug
Mirrors Second floor landing: The tapestry is being kept in storage as it
could not be kept under the mirrors because the mirrors would not
stick to it.
Oriental Rug Doug met with Costikyan & they have settled how & where to cut Costikyan
rug. Expected completion by Dec.
Schedule Finalized schedule to be available after Jean's next visit to NY.
Technology 1. Security: Surveillance Cameras (3rd Floor): wiring complete.
Cameras to be installed once construction near completion.
2. Computer: Upgrade for Landis BMS to be scheduled to
coincide with upgrade of 3rd floor a/c system. Installation to start
Oct 6.
3. Antenna: 7 Nextel phones purchased & are charging at the
house. Sawyers checked - house signal ok.
2
EFTA00578148
ESTATE PROGRESS REPORT — September 26, 2003
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
4. Computer Networking — WIFI entire house. Complete except Sawyers
in areas under construction.
5. MBR A/C Upgrade: Sequence of investigation determined in
Sept 4 meeting. To start with New Air Balancing Report.
Awaiting confirmation. 7 l st St is currently on 9- zone fan — it will
have a separate MBR fan. Quote for pricing of fan, possible chiller
& cooling tower upgrade expected by Oct 3.
Terrace Jean to make recommendations re: terrace on next visit to NY Pinto - Jean
Oct 1.
Bio Gear Dupont to ship the 3 bio suits on Sept 23 — delay due to co. running Dupont
out of materials.
Blackout Update Since Black Out the following Emergency Systems have been
checked or tested to assure proper operation in the event of a power
failure. The following list contains the results of these tests.
1. The Emergency generator has been tested and serviced by
cummings metro power, they found & repaired an oil leak &
suggest that the cooling radiator be cleaned & flushed. To be done
week of Sept 29.
2. Battery lighting inverter - battery racks & all 48 batteries have
been ordered.
3. Otis to complete tests on elevator emergency control system & Otis
wiring week of Sept 29. Exhaust fan has been changed.
3
EFTA00578149
ESTATE PROGRESS REPORT — September 26, 2003
457 MADISON
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Office Dividers GM viewed sample dividers at H Miller showroom. GM selected JE
free-standing units that require no structural work to the office in two
woods, dark brown cherry (standard) & mahogany dark (special-
order, more expensive). If JE approves, a rep to visit office to
measure & price. Color samples at 457 for JE to view.
Office Computers 1. Upgrade / change computers, new programs.
a. Approved: 21 computers to be re-vamped - 10 new computers
have been ordered; 11 remaining to be upgraded as needed.
b. 13 monitors to be replaced with LCD's. 18" black LCD's have
been installed. All are replaced.
2. New system: Consultants' report fed ex'd to JE in LSJ.
4
EFTA00578150
ESTATE PROGRESS REPORT — September 26, 2003
PALM BEACH
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Rennovations 1. Pascal due in PB end of Oct to review work that needs to be Pinto - Pascal
done. Pascal thinks construction will be ready to start in early Dec.
JE advised constr to commence in Feb 2004 as planned.
2. Pascal has provided a modified plan for enlarging the breakfast
room. Construction co. needed plans to apply for permit. JE
advised Pascal to have constr co. choose the architect.
Air Conditioning Cassidy has completed project. Complete
Computer 1. SL Powers has completed re-wiring. Complete
Networking / 2. PC Paramedics have ordered 8 access points, expected week of PC Paramed
WirelessNetwork Sept 22 — delayed. To be installed once received.
Upgrade
Curtains Falling curtains in several rooms to be re-hung temporarily so that Ray Dicrosta
they will last until renovations start. Ray Dicrosta to re-hang week
of Sept 29
Mercedes Guard car is complete. Car in NY.
Complete
Painting Small areas within house have been re-touched. Additional areas to
be added (MRB corridor — Part of Pink corridor, Kitchen ceiling
5
EFTA00578151
ESTATE PROGRESS REPORT — September 26, 2003
PARIS
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Boudoir Carpet has been installed. Complete
JE to view
Gym Room JE discussed with Pinto on site & decided on wall sconces & Pinto - Jean
double doors.
JE office Horseshoe table /Ash tray is expected in December. Pinto - Jean
Kitchen A/C to be fixed in conjunction with construction. New A/C co to Pinto
be sourced & scheduled. No update form Pinto office
6
EFTA00578152
ESTATE PROGRESS REPORT — September 26, 2003
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Living Room Separation to be added to round end of living room & new section Pinto — Jean
to be converted into MBR sitting room. Jean to buy 2 screens.
Shower Pump Pressure to be re-adjusted. New plumber to be sourced & Pinto
Pressure scheduled. No update Pinto office
PARIS - NEW APARTMENT
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Change Windows Double window to be changed to single window.
before Winter
7
EFTA00578153
ESTATE PROGRESS REPORT - September 26, 2003
Construction Demolition has commenced. Expected completion in April 2004. Pinto - Jean
New A/C & plumbing co's to be contracted will delay the schedule
and the receipt of the schedule, as nothing can be confirmed until
the new co's are on board.
PLANES
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
727 Boeing 1. Larry M awaiting fabric selection for office chair. JE to advise. JE
2. "C" Check / MSG3 heavy maintenance - expected completion 10/25
by Oct 25 provided there are no problems or glitches.
EFTA00578154
ESTATE PROGRESS REPORT — September 26, 2003
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
3. Pacific Gas Turbines of San Diego contracted for No. 2 engine
heavy maintenance at "C" Check. Engine to be shipped &
returned before completion of "C" Check, no rental engine
required.
4. JE working directly with designer for scheme. JE advised to
keep titanium, add red stripes, & maybe extend stripes. More
renderings expected.
5. Shower Installation — in progress. (Cabinets in Savannah,
Engineering in Dallas, Mechanicals in Waco.) JE selected beige
UltraLeather for headliner & toilet seat/lid to match the beige in
the carpet. Larry M has ordered material.
6. Eric has notified insurance co that 727 will be down for "C"
check. They will refund 30% of the premium once the plane
exceeds 45 days down.
Bell 1. Larry V is confirmed for Bell maintenance course Dec 1-12. JE
Helicopter 2. Helicopter is operational.
3. When should the helicopter be flown to St T?.
Gulfstrcam No. 2 engine is disassembled and awaiting inspection at Dallas 10/24 10/31
Airmotive, Millville. Expected re-installation by Oct 31.
Pilots Dave completed GS recurrent training Sept 19. Dave is in Flight
Engineering Sept 24-26.
9
EFTA00578155
ESTATE PROGRESS REPORT — September 26, 2003
STAFF
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Construction Still looking for candidate.
Manager and
Estate Manager
Zorro Maint. GM / & Brice working with agencies & looking locally to GM /
I0
EFTA00578156
ESTATE PROGRESS REPORT — September 26, 2003
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Person source new staff. & Brice
Rick Harrington Is there any further action to be taken? JE
& Brice & Brice sent reminder to GM to discuss their contract. JE
They would like to clear their contract issues. JE sd he would
think about it and let me know — reminder they are anxous to make
their plans and book flights
Vacation 1. Larry M requests holiday from Jan 1 through Jan 7 — he has JE
Requests family arriving in FL. JE to advise.
2. Floyd & Deidre request vacation Nov 5 through Nov 11. JE to JE
advise. FYI: 5 vaca days taken year to date.
MISCELLANEOUS
LOCATION COMMENT NEXT DATE REVISED
ACTION BY BY DATE
Directories 40 directories sent to the binder Sept 23 — they will take 3 10/17
weeks to bind. Samples of each of the 3 covers ready by
Oct 1. Metal binders have been ordered, expected by Oct 24.
II
EFTA00578157
ESTATE PROGRESS REPORT — September 26, 2003
Tea Pots Hand-blown / hand-painted tea pots & French tea pots from 10/3
Monaco have been ordered. All expected by Oct 3.
Christmas Gifts JE to advise who to send gifts to this Christmas. Please see JE
attached list of last year's recipients. *A-1
12
EFTA00578158
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 12ad85c4-e524-4918-bee9-180c1b40e011
- Storage Key
- dataset_9/EFTA00578147.pdf
- Content Hash
- 2698aabc20da2f2260b42f07f32fecc5
- Created
- Feb 3, 2026