Epstein Files

EFTA01139593.pdf

dataset_9 pdf 275.9 KB Feb 3, 2026 5 pages
From: Cecile de Jongh To: Ann Rodriquez J E <jeevacation@gmail.com>, Rich Kahn Subject: Fwd: fiber project Date: Thu, 03 Dec 2015 20:10:50 4.0003 Inline-Images: image001.jpg; iniage002.jpg FYI Begin forwarded message: From: Hector Cintron Date: December 3.2015 at 3:52:26 PM GMT-4 To: Jermaine Omar Welch Cc: 'Cecile de Jongh' Alyster Edw Subject: RE: fiber project Hi Jermaine, I just spoke with omar and the cable hasn't arrived, what we can do is this, I'll split the work on two trips, I'll go tomorrow weather permitting (it's supposed to be sunny) regardless if the VINGN circuit is ready and I'll do the installation. I'll bong up the router and install the 2 switches to be able to monitor the dragonwave and I'll leave the deep inspection and testing for the second trip once VINGN is up. There will be a downtime of between 1to 2 hours as I make the changes. If this is acceptable I'm a GO for tomorrow. What need after the switch installation is the login for the dragonwave so once this is done I can start with the verification of the link (no changes will be made). On the second trip I'll go to the island with Alyster takedown the dragonwave to do the following: • Test VINGN circuit • Test VINGN failover • Verify all grounding • Verify all connectors weatherproofing • Verify Lightning arrestors • Check all cables and replace cables if needed • Upgrade firmware on DW if needed • Make configuration changes to the DW if needed Let me know if this is acceptable. From: Jermaine Sent: Wednesday, December 02, 2015 16:31 To: Omar Welch Cc: 'Cecile de longh% Alyster Edwards; Hector Cintron Subject: RE: fiber project Email received from outside of the ATN domain. Use caution before using links/attachments. Good Evening Omar, I am following up to verify that VINGN is on target for tomorrow and Choice for Friday. Regards Jruan From: Hector Cant= (maia Sent: Monday, November 30, 2015 5:11 PM To: Jermaine Ruan Cc: Cede de )ongh; Omar Welch; Aster Edwards Subject: RE: fiber project Perfect, you got everything. The PDF only had the fiber from Power and Tel and not the items from curvature, so I Just wanted to make sure. Thanks From: Jermaine Wan rmailto: Sent: Monday, November 30, 201517:03 To: Hector Cintron Cc: Cecile de )ongh; Omar Welch; /doter Edwards Subject: Re: fiber project (Tail received from outside of the ATN domain. Use caution before using links/attachments. Good day/lector I have 2 simplex and 3 duplex cables from power and tel. I have 1hwic module and 1etc connector. EFTA01139593 Sent from my Phone On Nov 30, 2015, at 4:31PM, Hector Ontron wrote: Those are the fiber able from power and tel, was an order placed for the culvature Items? Bellow I highlighted the items: Green are the items from Power and Tel that arrived Yellow are the items from Culvature that I do not see listed on the PDF From: lermaMe (mailto: Sent Monday, November 30, 2015 16:29 To: Hector Critron; 'Cecile de )onoll' Cc Omar Welch; Alyster Edwards Subject RE: fiber project Einar received from outside of the MN domain. Use caution before using links/attachments. Please see attached From: Hector Cintron (matt Sent: Monday, November 30, 2015 12:54 PM To: Ceole de )ongh Cc: Omar Welch; lerrnaine, Nyster Edwards Subject RE: fiber project lermaine, Can you send me a list of all the items that you received? I want to make sure we have everything. Utast created a BOM to keep track of what is needed and I'm sure I'll adding to the work/pending list 5O1L1 0111 part desc Installed Location arrived Responsibility 1 CISCO2921/K9 Cisco Router Data Room Installed Choice 1 mcac-o V'NGN Simplex Single Mode Module In the cisco router Data Room (Si 1 SANGN Simplex Cable 35' ST to LC Between Cisco Router and Patch Panel (coming from STT) Data Room LSI 1 HWIC-1GE-SFP wiC Card for SIP Cisco Router Data Room (Si 1 MM_*r cable 6' Sia Between Cisco Router and Patch Panel Data Room LSI 1 GLC-SX-MM MM Fiber Module Cisco Router Data Room x Choice 1 GLC-SX-MM MM Fiber Module Cisco 3560 Building -Gym x Choice 1 IMEI MMINIM Between Cisco 3560 and patch Panel Building -Gym LSI 4 rackmount screws for Cisco 3560 Building -Gym LSI 1 3560G-24 Cisco 3560 Building -Gym x Choice 1 3560G-24 Cisco 3560 Outside Cabinet x Choice 4 rackmount screws for Cisco 3560 Could use existing from netgear Outside Cabinet LSI Other Pending Items/Work Cross Connect STT Beach VINGN Router Config Info X LSI EFTA01139594 Dragonwave Warrantee Info Dragonwave Survey Includes Signal, Firmware, Hardware, Monitoring, Grounding Choice From: Cede de Jongh Sent Wednesday, November 25, 2015 13:94 To: Hector Caton Cc Omar Welch; Jermaine Subject Re: titer project Email received from outside of the ATN domain. Use caution before using links/attachments. Thank you Hector. On Nov 25,2015, at 11:37 AM, Hector Cintron wrote: I can only comment about 113 3 - it should, this way I can do a fill integration of the VINGN, Dragonwave backup, test (allover. The plan that I would like to do: • install VINGN via the new router. Test it and switch the island over this new connection pnmary) • Once this is done I can takedown the Dragonwave connection to add some switches to be able to monitor the link and take over maintenance. Once this is complete • Reconnect the Dragonwave as secondary link • Test (allover to Secondary (OW). The above plan has a 1-2 min downtime. If ViNGN is not ready I can still do the install but I need to install the switches needed to monitor the dragonwave there will be a downtime of a few hours as I do the swap but no testing will be done. Hector. From: Cede de Jongh Sent Wednesday, November 25, 2015 10:40 To: Hector &Aron Cc Omar Welch; Jermaine Subject Re: fiber paged Email received from outside of the ATN domain. Use caution before using links/attachments. Ok. 1. Does this still need to be scheduled with them? 2. If so, do we do that or do you? 3. Does this need to be done before Hector goes to the island or can it be done anytime afterwards? On Nov 25, 2015, at 10:19 AM, Hector Cintron •: ,• wrote: The crossover does require a visit to the Pole (the one in St Thomas at the beach) where ViNGN connects to the fiber the goes to the Island. From: Cede de Jongh Sent Wednesday, November 25, 201510:17 To: Omar Welch Cc Jermaine; Hector Ontron Subject Re: titer project Email received from outside of the MN domain. Use caution before using links/attachments. Does this "crossover" require VINGN to visit the site or Is it something that is done remotely from their office? On Nov 25, 2015, at 10:01 AM, Omar Welch wrote: Hi Cecile The connection does play a part in the delay until Monday but not the confirmation for today as no confirmation was made for today. We are assisting ViNGN to be ready for Monday. 'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation? On Nov 25,2015, at 8:13 AM, Cecile de Jongh - wrote: Email received from outside of the MN domain. Use caution before using links/attachments. Good morning Omar and Hector, Has the date switched to Monday due to the fact that VINGN has not done the crossover? If so, why did Hector confirm today? Will VINGN complete the crossover by Monday? On Nov 25, 2015, at 9:02 AM, lermaine . - wrote: EFTA01139595 Good day Omar I am not understanding Mn. As per my conversation, I stated Monday is too long. I started receiving emails from Hector concerning the installation shortly after. One of my last email was confirming tomorrow. Jruan From: Omar Welch a Sent: Wednesday, November 25, 2015 8:55 AM To: lermane Cc: Hector Cintron; Cece de longh Subject: Re: fiber project lermaine per my message Hector will not be able to complete installation until Monday please make arrangements for this. Also we are still awaiting confirmation from VINGN on the cross connect. "True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation." On Nov 24, 2015, at 3:32 PM, lermalne - wrote: Email received from outside of the ATN domain. Use caution before using links/attachments. Good Day Hector, Please be advised, all components are here in the office ready for installation tomorrow. Does VINGN have the crossover in place? Regards Jruan From: Hector Cintron mailto: Sent Tuesday, November 24, 2015 12:28 PM To: lermaine Ruan Cc Omar Welch Subject: RE: fiber project Hi iermaine. Can you send me a list of the items you have for the install? I want to make sure we have everything before I head over there. Thanks. From: Hector Cintron Sent Wednesday, November 11, 2015 10:47 To: lermatne Ruan' Cc Omar Welch Subject: RE: fiber project I cannot give you a date sense it's all based on the following: ? VINGN installs the cross connect ? whether we order the parts or LS1 order the parts. This was something that Omar was going to speak to (sorry I do not know the name) LSJ Finance. o For VINGN connection (Router Module, Fiber Module, Fiber cable) o Choice connection (switches, fiber cables) Also just an FYI I'll be going on vacation staring this Friday and I'll be back on Monday 23rd so assuming all the above is installed, purchased and delivered by the time I get back it would be sometime the week of the 23rd Hector. From: lermame Ruan [maslto ] Sent Wednesday, November 11, 2015 09:52 To: Hector Ontron Cc Omar Welch Subject: Re: fiber project Erna,' received from outside of the ATN domain. Use caution before using links/attachments. Good morning gentlemen The principal is requesting a new date for the fiber. Do you have a suggested estimated time of completion? Regards Jruan Good evening all When is the new date for the connection so I can update my superiors Regards Jruan Sent from my iPhone EFTA01139596 On Nov 10, 2015, at 11:25 PM, Hector Cannon -- wrote: Hi Guys, I haven't received notifications that the items that we need to finish came in so that would be no. From: Omar Welch Sent: Tuesday, November 10, 2015 19:06 To: .1emaine Ruan; Hector Ontron Subject: Re: fiber project Hector? 'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation." On Nov 10, 2015, at 6:44 PM, 'ermine Ruan ea- wrote: Email received from outside of the ATN domain. Use caution before using links/attachments. Good night Omer Yep, I am trying to line up the runs in the morning Regards Jruan Sent from my (Phone On Nov 10, 2015, at 6:19 PM, Omar Welch wrote: To come to the Island? 'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation." On Nov 10, 2015, at 6:10 PM, lermaine ffi wrote: Email received from outside of the MN domain. Use caution before using linkstallachinents. Good day omar Is hector still on for tomorrow? Regards Jruan EFTA01139597

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
119ad6c4-b567-404a-8bf1-28af40767905
Storage Key
dataset_9/EFTA01139593.pdf
Content Hash
c073079833e0fdbdd46e473249efaad0
Created
Feb 3, 2026