EFTA01124810.pdf
dataset_9 pdf 143.4 KB • Feb 3, 2026 • 3 pages
Zorro Development Corp
Landscaping:
Approval that Aspen Landscaping have the contract to
refurbish, need to revise scope of work - to be forwarded by
the end of the week.
Approval to remove Pondrosa Pines & existing landscape lights
from Main House gate area - in house project
Relocate more Pinions to this area - in house project
Approval to remove dead pine in front courtyard - in house
project
Approval to add Cypress trees to front parking area
Need to source Evergreen trees for rear lavender beds
Bench Seat to be placed in front of Chess Set Fountain
Approved replacement of the landscape timers
Estancia Fountain:
Approved to move ahead with Bowl Lift, Electrical & Pump -
$2,500.00
Chess Fountain:
Approved to move ahead with resurfacing will forward
estimate by the end of the week
Ranch Front Gates:
Approval for the installation of new Gate Openers, reviewing
estimate and will forward
EFTA01124810
Sarah's Office Curtains:
Approved fabric - Golden Coin #23233
Will forward an estimate on Fabric and Fabrication by the end
of the week
Media Room Curtains:
Approved fabric - Blue Haze #32250
Will forward an estimate on Fabric & Fabrication by the end of
the week
Gym Mirrored Doors:
Protective rubber strip to be added to bottom of doors
Main House Exterior Door:
All need to be adjusted
Gym Rug:
Contact local carpet supply. Using same wool carpet in
office have a section cut and bound in the required size
Will forward estimate as soon as possible
Pool & Spa:
Approval to move forward with obtain estimates to resurface
pool & possible tile bands
Pool Clock:
Purchase a large pool clock - will forward suggestions as soon
as possible
Facial Machine:
To be purchased in NYC with input from Karyna &E
EFTA01124811
IT & Phones:
Approval to move ahead with phones system in Main House
Approval to move ahead with Microwave solution, will forward
as soon as possible
Well K:
Approval to install transponder and muliti media filters, will
forward estimate by the end of the week
Water Samples:
Requested water samples taken from the tap - Main House (2
locations) & Bunkhouse.
Ford Expedition:
Approval to replace bench seat with 2 Captains Chairs
Yurt:
Approval to move ahead with replacements of
walls/roof/windows - estimate $10,240
Will confirm this price with the vendor this week and forward
Painting:
Overall painting to continue now weather has improved
EFTA01124812
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 103348f1-ceb4-4653-9bb9-070151601fb9
- Storage Key
- dataset_9/EFTA01124810.pdf
- Content Hash
- 5904b8eb7e5c03c2fe5fdaaa89c0238d
- Created
- Feb 3, 2026