From: Leighton Allenby
To: "Jeffrey E." <jeevacation®gmail.com>
Cc: NYC - Richard Kahn >, Leighton Allenby
Subject: Re:
Date: Fri, 28 Aug 2015 21:07:32 +0000
Hello Mr. Epstein,
Prepping for the storm has consumed my time and the staffs time as well. I cannot control mother nature.
Omar came over and looked at job on 21st and despite repeated calls I have not received final pricing. I called
him earlier today and now have his square foot price which I will convert to a final number after I look up block
cost for large 250' wall which I measured with Chris the other day and its 385' long. I will have this to you this
evening. Chris said you wanted this wall two cement blocks wide (running linear by 10' tall, stone faced on the
top and driveway side. The block side facing the maintenance buildings would be painted. Is that correct?
I have been on the excavator repairing the barge ramp and road access to the driveway to the left of the boat dock
as it was washed away form the storm and no staff was on LSJ today - the pricing would have been completed
earlier. I have stopped as the barge isn't coming over until Wednesday.
Right now no intemet, we just went back on power and the alarms are sounding in the generator panel room and
I am dealing with that....Anna spoke with Danny on phone (was told by Anna Danny said this happens all the
time and he will reset in the AM). Danny has not returned my text or call. Terrance is working on the internet
problem remotely and will come over in the AM if he cannot fix.
I will update the timeline to reflect days missed by staff and storm preparation and cleanup by tomorrow am.
The barge isn't going to do our runs until Wednesday - they are on one engine
I will put on the timeline the # 8 from the update from August 11th meeting - see email below
The plans have been reviewed, I am in communication with Buck steel, he was on vacation and We need to price
out the concrete work. I am going to do a separate timeline on this projects there are many phases.
8. Kevin from Jaredian mentioned that the working drawings should be completed by the end of September. They had to have plans
modified for proper venting for carpenters shop and fertilizer/chemical storage.
Best,
Leighton
Leighton Allenby <
Aug 1I 3:54 PM (I hour
ago)
to Jeffrey, NYC, Anna, Daphne
Hello Mr. Epstein,
Today Anna, Danny Vicars and I met with David Rosa from CZM and Kevin from The Jaredian Design Group to discuss:
I. Layout of the proposed maintenance and workshop building project
2. Two roofs for the RO Plant and Generator building.
The meeting went well. Concerns & comments brought up by David Rosa:
EFTA00847586
1. New height of RO and Generator roof from across the waters. I replied that the pitch of the roof was aesthetically pleasing and
roof color chosen by you is soft and blends into the skies. He quickly agreed.
2. He had no concerns with proposed building and 80 foot layout and placement of building. We walked the proposed layout that
Danny Vicars laid out with orange markers.
3. David had a complaint from someone that we discussed. Complaint was that we were creating stone buffers preventing boaters
from coming ashore to the beaches. I assured him this wasn't happening since I started and that there were natural reefs that
prevented the boaters from coming ashore. He agreed an said that he had to ask as there was a complaint. (Most likely someone
saw machines removing rocks from the shore for the waterfall. We need to be careful.)
4. David wanted to inspect grading of roads. We showed him one of the roads going from maintenance building to tennis court and
he was pleased.
5. We discussed putting in drainage swales after the asphalt and minimizing damage and he agreed that we would have better
control of the water rather than guessing where the drainage swales should be. David wants protective erosion control at each
new drainage swale per permitt. I agreed.
6. We discussed the Coastal Zone Management Act (CZMA) and why it is important for us to observe this
Act. http://www.coralreeig grants/noaa/USVI-CZMFactsheet-Jun03.pdf
7. David and I discussed my qualifications, previous projects on coastal zones and my working with the Town of Falmouth
conservation Department on various projects on Cape Cod. David is from Arlington, VA
8. Kevin from Jaredian mentioned that the working drawings should be completed by the end of September. They had to have
plans modified for proper venting for carpenters shop and fertilizer/chemical storage.
9. Daphne gave me a set of drawings that I will review.
10. I asked David if he will sign off on project and David commented that most likely after he reviews the plans once more.
Best,
Leighton
; .:
11
Leighton Allenby
Director of Properties
On Fri, Aug 28, 2015 at 3:54 PM, jeffrey E. <jeevacation@grnail.com> wrote:
timline has changed???? !!! why?
On Fri, Aug 28, 2015 at 2:37 PM, LAllenby < > wrote:
Drawings by end of Sept
Leighton Allenby
Director of Pro ernes
On Aug 28,2015, at 2:26 PM, jeffrey E. <jeevacation@gmail.com> wrote:
where are we with all the omar bids on the timleine , the storm should not have held up bids , same with
drawgings for maintenace et.
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
EFTA00847587
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jea@gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00847588
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 0f5bfc8a-6fe9-46c3-a053-bc19171c2f85
- Storage Key
- dataset_9/EFTA00847586.pdf
- Content Hash
- 528448ea21fa0cb0c7ab585a24d203b8
- Created
- Feb 3, 2026