Epstein Files

EFTA00847586.pdf

dataset_9 pdf 193.5 KB Feb 3, 2026 3 pages
From: Leighton Allenby To: "Jeffrey E." <jeevacation®gmail.com> Cc: NYC - Richard Kahn >, Leighton Allenby Subject: Re: Date: Fri, 28 Aug 2015 21:07:32 +0000 Hello Mr. Epstein, Prepping for the storm has consumed my time and the staffs time as well. I cannot control mother nature. Omar came over and looked at job on 21st and despite repeated calls I have not received final pricing. I called him earlier today and now have his square foot price which I will convert to a final number after I look up block cost for large 250' wall which I measured with Chris the other day and its 385' long. I will have this to you this evening. Chris said you wanted this wall two cement blocks wide (running linear by 10' tall, stone faced on the top and driveway side. The block side facing the maintenance buildings would be painted. Is that correct? I have been on the excavator repairing the barge ramp and road access to the driveway to the left of the boat dock as it was washed away form the storm and no staff was on LSJ today - the pricing would have been completed earlier. I have stopped as the barge isn't coming over until Wednesday. Right now no intemet, we just went back on power and the alarms are sounding in the generator panel room and I am dealing with that....Anna spoke with Danny on phone (was told by Anna Danny said this happens all the time and he will reset in the AM). Danny has not returned my text or call. Terrance is working on the internet problem remotely and will come over in the AM if he cannot fix. I will update the timeline to reflect days missed by staff and storm preparation and cleanup by tomorrow am. The barge isn't going to do our runs until Wednesday - they are on one engine I will put on the timeline the # 8 from the update from August 11th meeting - see email below The plans have been reviewed, I am in communication with Buck steel, he was on vacation and We need to price out the concrete work. I am going to do a separate timeline on this projects there are many phases. 8. Kevin from Jaredian mentioned that the working drawings should be completed by the end of September. They had to have plans modified for proper venting for carpenters shop and fertilizer/chemical storage. Best, Leighton Leighton Allenby < Aug 1I 3:54 PM (I hour ago) to Jeffrey, NYC, Anna, Daphne Hello Mr. Epstein, Today Anna, Danny Vicars and I met with David Rosa from CZM and Kevin from The Jaredian Design Group to discuss: I. Layout of the proposed maintenance and workshop building project 2. Two roofs for the RO Plant and Generator building. The meeting went well. Concerns & comments brought up by David Rosa: EFTA00847586 1. New height of RO and Generator roof from across the waters. I replied that the pitch of the roof was aesthetically pleasing and roof color chosen by you is soft and blends into the skies. He quickly agreed. 2. He had no concerns with proposed building and 80 foot layout and placement of building. We walked the proposed layout that Danny Vicars laid out with orange markers. 3. David had a complaint from someone that we discussed. Complaint was that we were creating stone buffers preventing boaters from coming ashore to the beaches. I assured him this wasn't happening since I started and that there were natural reefs that prevented the boaters from coming ashore. He agreed an said that he had to ask as there was a complaint. (Most likely someone saw machines removing rocks from the shore for the waterfall. We need to be careful.) 4. David wanted to inspect grading of roads. We showed him one of the roads going from maintenance building to tennis court and he was pleased. 5. We discussed putting in drainage swales after the asphalt and minimizing damage and he agreed that we would have better control of the water rather than guessing where the drainage swales should be. David wants protective erosion control at each new drainage swale per permitt. I agreed. 6. We discussed the Coastal Zone Management Act (CZMA) and why it is important for us to observe this Act. http://www.coralreeig grants/noaa/USVI-CZMFactsheet-Jun03.pdf 7. David and I discussed my qualifications, previous projects on coastal zones and my working with the Town of Falmouth conservation Department on various projects on Cape Cod. David is from Arlington, VA 8. Kevin from Jaredian mentioned that the working drawings should be completed by the end of September. They had to have plans modified for proper venting for carpenters shop and fertilizer/chemical storage. 9. Daphne gave me a set of drawings that I will review. 10. I asked David if he will sign off on project and David commented that most likely after he reviews the plans once more. Best, Leighton ; .: 11 Leighton Allenby Director of Properties On Fri, Aug 28, 2015 at 3:54 PM, jeffrey E. <jeevacation@grnail.com> wrote: timline has changed???? !!! why? On Fri, Aug 28, 2015 at 2:37 PM, LAllenby < > wrote: Drawings by end of Sept Leighton Allenby Director of Pro ernes On Aug 28,2015, at 2:26 PM, jeffrey E. <jeevacation@gmail.com> wrote: where are we with all the omar bids on the timleine , the storm should not have held up bids , same with drawgings for maintenace et. please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for EFTA00847587 the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jeevacation@gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to jea@gmail.com, and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA00847588

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
0f5bfc8a-6fe9-46c3-a053-bc19171c2f85
Storage Key
dataset_9/EFTA00847586.pdf
Content Hash
528448ea21fa0cb0c7ab585a24d203b8
Created
Feb 3, 2026