From: Richard Kahn
Sent: Saturday, September 26, 2015 6:48 PM
To: Jeffrey Epstein
Subject: Fwd: Lutron lighting system status
Sent from my iPhone
Begin forwarded message:
From: Al Buonanno
Date: September 26 2015 at 2:39:16 PM EDT
To: "Richard Kahn
<mailto "Merwin Dela cruz"
<mailto:m
Subject: lighting system status
Hello Richard and Merwin,
As you know the lighting system is not completed. While much of the lighting is fully functional there are a few
locations that are not. The troublesome locations are the dimmed/switched outlets. These locations had specialty
wiring that will need further work from the electricians. Please note that we have been assisting them as much as
possible.
As you are both aware the starts and stops have added a lot of time to the project. I am confident that one
more strong push after Mr. Epstein departs on October the 5th and we will be in good shape.
Punch List:
Troubleshoot all outlets and correct RPM wiring as required.
Double check all load identification for accurate documentation for the as build system design.
Install all engravings on keypads. (most should arrive this week)
Finalize additional customized keypads with specialty functions. (these are keypads with house wide
commands)
EFTA_R1_01304399
EFTA02340115
Order and install all customized antique plates. (note: all keypads needed to be installed for proper
custom dimensions. Measurements were performed on Friday and plates will be ordered on Monday. 2-3 week lead
time.
Please contact me with any questions, comments, or concerns.
Regards,
Al
Alfred Buonanno
Clarity Custom Inc.
1792 West 11th Street
Brooklyn NY 11223
2
EFTA_R1_01304400
EFTA02340116
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 0c3ea470-2ac6-48d0-81a6-5a5be983329e
- Storage Key
- dataset_11/EFTA02340115.pdf
- Content Hash
- e0c8df4899cc41788d701e4c17d2c7ac
- Created
- Feb 3, 2026