Epstein Files

EFTA01107292.pdf

dataset_9 pdf 103.4 KB Feb 3, 2026 2 pages
JE Punch List —June 18. 2012 1. Clean up - Top of the Desal plant - Engineering - Shed and its Workshops 2. Equipment and Vehicles - Sell equipment - Buy new Kawasaki bikes and mules 3. Computers - Buy new computers 4. Five Palms — TOP PRIORITY - Exterior Door Shutters — removable option - Painting - outside to be completed after visit - Furniture — Sofa — leather samples JE will review while on site - Piano - needs tuner — piano on STT 6/16 - Mirrored siding — Panels on site 6/14 - Glue on site - Tapestry Molding for Ceiling — Ion - Transformer building - Building 5/31, 5/25 - final electrical hookup 6/8 — temporarily powered by generator - Fire pit —gas unit needs to be returned and reordered — Brice has ordered - Cabinets — add push latches on doors 5. Grotto - Floor resin - Genset wiring — scheduling to be determined 6. Berm/Top of Hill - Entry rocks 7. Engineering/Maintenance Yard - Steel Shed — foundation in progress - Metal Sheets - on old building will be replaced week of 6/4 8. Triangle— landscaping direction required from JE 9. Flagpole Pool Cabana - - Recovering of sofa/chairs - Furniture — needs new desk — Sarah 10. Floating dock - Jet ski docking — review - Table/Dock Box — Bill starting 6/4 11. Entry Tree Lights — installation complete 12. Solutions for Generators — Sound proofing solution forwarded to JE, require direction, wall built 13. Tiki — Darren is contacting the vendor regarding the shields 14. Kite House — review of wooden outside furniture - Sarah 15. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 16. Chillax Bathroom - requires blue rugs for bathroom & vanity area — Sarah 17. Mechanical Building - Replacement Transformer — estimated date to be shipped from factory (Illinois) 8/21 18. Boats - Lady G (Fat Cat) - refurbish - Midnight Express — should be in the water 6/21 - Lady K - sell - Big N - sell - Calypso — refurbish EFTA01107292 19. Gym Road,- road grading after Five Palms — continues 20. Timers — review installing timers on air conditioners, irrigation water systems, and lights 21. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond and beach 22. Main entrance/gravel/grade - complete 23. Wind Door — wind door on kitchen side needs openers - wind door stops 24. Landscaping —Josephine to visit and organize garden 25. Solar lights - Brice to order 500 landscape lights 26. Roads — grade all roads — Wednesday 6/6 — Tom - please review all roads so you can pitch, drain, with Jules 27. Library — Lights on bookshelves need attention - Temperature? — Atlanta Refrigeration 28. Main hill — Asphalt path — Monique to price 29. Master Suite - Large master bed planting - Put self-closing hinges on the master bedroom door to the outside 30. New Employee Bathrooms 31. Gym, - Add new doors in yoga and ballet room closets - New punching bag - Clean up electronics/stereo 32. Benches 33. Office Pavilion - East window in Sarah's office is rusted outside 34. Danny Vicars — schedule boat driving lessons 35. Hangar - Jermaine to redo internet at hangar - Hangar pad to be built EFTA01107293

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
08f2577e-210f-49c3-838f-57cd2ca61d70
Storage Key
dataset_9/EFTA01107292.pdf
Content Hash
703bcf2399b688135f352451e4b14fd5
Created
Feb 3, 2026