From: "Jeffrey E." <jeevacation@gmail.com>
To: "John P. Woods, AIA"
Subject: Re: Little St. James Metal Buildings Email I
Date: Thu, 22 Jun 2017 18:20:19 +0000
ask jimmy fraguela to bid please asap. i will use him on the pools quickly
On Thu, Jun 22, 2017 at 2:09 PM, John P. Woods, AIA < wrote:
Jeffrey,
Attached is the proposal for the Maintenance Building by Apex Construction. The cost is very favorable for
that structure. Although I don't have my notes handy, this building will cost less than $400,000.00, once you
include the cost of the steel structure and exterior roofing and walls. This makes it less than $50.00 per square
foot. The higher unit cost for the R.O. & Generator buildings at $76.00 per square foot is a result of the
extensive foundation work and the creation of the storage room between the two buildings. We could reduce
the cost there by eliminating the storage room and building a retaining wall with a slab on grade to link the two
buildings. As before, we recommend Apex Construction be selected for this project. Let me know how to
proceed.
JPW
Sent from my iPhone
Begin forwarded message:
From: "APEX CONSTRUCTION COMPANY, INC." <
Date: June 22, 2017 at 12:23:30 PM EDT
To: "John P. Woods"
Cc: Butch Hodge
Subject: Re: FW: Little St. James Metal Buildings Email 1
Good morning:
Attached is proposal for Maintenance & Workshop Project - Little St. James.
Thank you for the opportunity to bid.
Maureen
On Fri, Jun 9, 2017 at 2:40 PM, John P. Woods < > wrote:
Butch,
This is the email containing drawings for the Maintenance Building. Let me
know.
JPW
----Original Message
From: John P. Woods [mailto:
EFTA01042411
Sent: Monday, May 15, 2017 12:19 PM
To: 'APEX CONSTRUCTION COMPANY, INC.'
Cc: 'ann rodriquez; 'Daphne Wallace'
Subject: Little St. James Metal Buildings Email 1
Good Day Butch,
Attached are the drawings I spoke with you about providing a proposal for
constructing two separate pre-engineered structures on Little St. James. The
Little James people have already solicited cost proposals from the metal
building manufacturer for the structure, metal siding, and exterior doors.
What we need is the cost for everything else; site work, foundations,
erection, and mechanical/electrical systems. I am also including the metal
building manufacturer's cost proposal for your information. If you ARE
INTERESTED, PROVIDE A LUMP SUM PROPOSAL AND BREAKDOWN BY FRIDAY, JUNE 9,
2017. Site visits can be arranged as requested. Due to the size of the
files, two emails will be sent.
JPW
This email has been checked for viruses by Avast antivirus software.
APEX Construction Company, Inc.
P. O. Box 305048
St. Thomas, Virgin Islands 00803
(Office) (Fax
Picture
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation@gmail.com, and
EFTA01042412
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01042413
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 07ee56a6-ff5b-440a-9795-2d3b91284e9c
- Storage Key
- dataset_9/EFTA01042411.pdf
- Content Hash
- 0019d27a825396ed7b4d64ecbd16c1a5
- Created
- Feb 3, 2026