C ti architecture interiors
AL DEYYAR BUILDING AL BARSHA 1PO BOX 27138
TEL:043995153
C t FAX043990072
architecture
&interiors
Ref:je/vi/ha/01 18.04.2017
Attention To : Mr Jeffrey Epstein
Subject : Complete Design Offer for Hammam Complex in Great St James Island
Dear Sir,
With reference to the above subject please find below our proposal for design works for the
above mentioned project.
1.Scope of the Interior Design Works & deliverables :
All design works as per the initial design brief :
1.Planning
2.Architecture 80,000 USD
3.Interior Design 120,000 USD
4.Electromechanical design 110,000 USD
5.Floor heating system design 20,000 USD
6.Lighting design (lux calculation by supplier) 10,000 USD
7.Structural design 40,000 USD
8.Construction schedule
9.Guideline BOQ & Specification
The design packages shall include all the below unless otherwise mentioned:
1. Concept design 2-4 week
2. Schematic design 4 week
3. Detailed design 4 week
4.Specifications & BOQ 2 week
*Design criteria shall be as per the international standart
2.Time
The time for the whole design works is 8-12 weeks.
Client approval time will be added up.
Any revisions after that to be quoted separately.
Major revisions ,if any, to be quoted seperately to be agreed mutually.
3.Design Fees and Payment Schedule:
Total lump sum design fee is 380,000.00 USD
(THREEHUNDREDEIGHTYTHOUSANDUNITEDSTATEDOLLARS)
%25 advance payment
%25 upon final concept submission
%20 schematic phase
EFTA00803341
C t I architecture interiors
%20 Detailed design
%10 BOQ (quantities) & specifications
*pis refer to the attached standart deliverable list
*Any meeting outside UAE shall be back to back invoice to client
*Design Work to start once this offer is signed by both parties & advance payment is made.
*Site topography (terrain levels) to be provided by client for the detailed design and the level
of the entrance (s)
Bank Details:
UAE DIRHEM ACCOUNT:
Bank Name : ADCB (ABU DHABI COMMERCIAL BANK)
AED Account no (iban) : AE870030010228730124001
Swift code : ADCBAEAA
4.Exclusions:
The below design works are excluded from this offer (not limited to):
4.2 any insurance (PI can be included upon additional fee)
4.3 any authority approvals-local authority fees by client
4.4 any construction or project management activity
4.5 security system design
4.6 any green building certification design
4.7 acoustic design
4.8 Detailed landscape design
4.9 signage design & lighting design
4.10 bidding ,contracting and tender evaluation services
4.11 shop drawings review
4.12 structural design calculation based on the local codes
4.13 energy modeling
4.14 any special consultancy
4.15 Detailed cost estimation
4.16 tender documents and tendering
4.17 site planning
4.18 traffic planning
4.19 program and management services
4.20 water feature design
4.21 Any signage or graphic design
4.22 site supervision & management
4.23 any authority approval or process or document related to local works.
4.24 Any third party fees
4.25 meetings outside UAE (Accomodation,transporation and service fees)
Zek
NNirvia
Yours sincerely, Cem Kapancioglu
Thanks & Best Regards,
2
EFTA00803342
C ti architecture interiors
Cem Kapancioglu
Architect/Leed Green Associate
Managing Director
C K Architecture Interiors L.L.C.
Assistant Proffesor in NYIT
Mobile:+971 (0) 50 745 86 13
M. Box 27138,Dubai
List of Deliverables
1.1 STANDART LIST OF INTERIOR DESIGN DOCUMENTATION
Table of Contents
List of Deliverables by the Architect to the Client:
1- CD. Concept Design
2- SD. Schematic Design Phase
3- DD. Design Development Phase
4- BOQ&Material Specification Design phase
1.Concept Design Phase
1.1.Perspectives, Images, Renderings
1.2.Sketches, Mood images,layouts
2. SD. Schematic Design Phase
1. Layouts showing indicative Furniture layout
2. Flooring plans
3. Reflected Ceiling Plans showing preliminary lighting
4. Interior Elevations with major material decisions
5. Mood boards
6. Main Finishing Materials list
3 DD. Design Development Phase
3
EFTA00803343
C t I architecture interiors
Cover
1. Cover Page
2. General Notes
3. List of Drawings
Basic Drawings
4. Floor Plans with full dimensions
5. Floor Finish Plan
6. Furniture Plan
7. Elevations
8. Reflected Ceiling Plans
9. Typical Details
Detailed Drawings
10. Detailed Floor Plans including wet areas
11. Detailed Elevations including wet areas and kitchens
12. Detailed Sections including wet areas and pantries
13. Locations, dimensions, finishes and frame details of all doors, mirrors,
glass partitions and artwork
14. Detailed Reflected Ceiling Plans
15. Details of the Hammam
-BOQ&Material Specification Design phase
1.Door schedule
2.Material Specifications
3.Bill of Quantities
4
EFTA00803344
C ti architecture interiors
STANDART GENERAL DRAWING DELIVERABLES
GENERAL:
335/GEN-001 COVER SHEET
335/GEN-101 LIST OF DRAWINGS
335/GEN-102 PROJECT DOCUMENT
335/GEN-103 PROJECT DOCUMENT
335/GEN-104 PROJECT DOCUMENT
335/GEN-105 AREA CALCULATION SHEET
ARCHITECTURAL DRAWINGS:
00-001 GENERAL NOTES, ABBREVIATIONS & STANDARD NOTATIONS
00-002 SITE SETTING OUT LAYOUT
00-003 SITE LEVELS AND SITE SECTIONS
00-101 SECOND BASEMENT FLOOR PLAN
00-102 FIRST BASEMENT FLOOR PLAN
00-103 GROUND FLOOR PLAN
00-104 MEZZANINE FLOOR PLAN
00-105 FIRST FLOOR PLAN
00-106 ROOF PLAN
00-107 SECTION 1 & SECTION 2
00-108 SECTION 3 & SECTION 4
00-109 ELEVATION 1, ELEVATION 2 & ELEVATION 3
00-110 ELEVATION 4 & ELEVATION 5
00-111 SECOND BASEMENT FLOOR PLAN- FINISHES SCHEDULE
00-112 FIRST BASEMENT FLOOR PLAN- FINISHES SCHEDULE
00-113 GROUND FLOOR PLAN - FINISHES SCHEDULE
00-114 MEZZANINE FLOOR PLAN - FINISHES SCHEDULE
00-115 FIRST FLOOR PLAN - FINISHES SCHEDULE
00-116 ROOF PLAN - FINISHES SCHEDULE
00-117 SECOND BASEMENT FLOOR - REFLECTED CEILING LAYOUT
00-118 FIRST BASEMENT FLOOR - REFLECTED CEILING LAYOUT
00-119 GROUND FLOOR - REFLECTED CEILING LAYOUT
00-120 MEZZANINE FLOOR - REFLECTED CEILING LAYOUT
00-121 FIRST FLOOR - REFLECTED CEILING LAYOUT
00-122 ROOF - REFLECTED CEILING LAYOUT
00-123 RAMP SECTIONS 1 OF 2
00-124 RAMP SECTIONS 2 OF 2
00-125 WALL SECTIONS 1 OF 2
00-126 WALL SECTIONS 2 OF 2
00-127 DOOR & WINDOW SCHEDULE
00-128 DOOR DETAILS & IRONMONGERY SCHEDULE
00-129 ALUMINIUM DETAILS
ARCHITECTURAL DRAWINGS:
00-130 STAIRCASE DETAILS
00-131 LIFT DETAILS
00-132 SUBSTATION DETAILS
00-133 TOILET DETAILS
00-134 PANTRY DETAILS
5
EFTA00803345
C sti architecture interiors
00-140 STANDARD ARCHITECTURAL DETAILS - 1 OF 3
00-141 STANDARD ARCHITECTURAL DETAILS - 2 OF 3
00-142 STANDARD ARCHITECTRUAL DETAILS - 3 OF 3
STRUCTURAL DRAWINGS:
335/S-001 GENERAL NOTES & STANDARD DETAILS
335/S-002 SHORING LAYOUT & DETAILS
335/S-101 FOUNDATION LAYOUT
335/S-102 RAFT SLAB DETAILS
335/S-103 FIRST BASEMENT FLOOR FRAMING LAYOUT
335/S-104 RC DETAILS FIRST BASEMENT FLOOR
335/S-105 GROUND FLOOR FRAMING LAYOUT
335/S-106 RC DETAILS GROUND FLOOR
335/S-107 MEZZANINE FLOOR FRAMING LAYOUT
335/S-108 RC DETAILS - MEZZANINE FLOOR
335/S-109 FIRST FLOOR FRAMING LAYOUT
335/S-110 RC DETAILS FIRST FLOOR
335/S-111 ROOF FRAMING LAYOUT
335/S-112 RC DETAILS ROOF
335/S-113 ROOF MACHINE ROOM FRAMING LAYOUT & DETAILS
335/S-114 COLUMN DETAILS
335/S-115 STAIRCASE DETAILS
335/S-116 RAMP DETAILS & LIFT WALL DETAILS
WATER SUPPLY DRAWINGS :
335/W-001 GENERAL NOTES & STANDARD DETAILS
335/W-101 SECOND BASEMENT FLOOR- WATER SUPPLY LAYOUT
335/W-102 FIRST BASEMENT FLOOR- WATER SUPPLY LAYOUT
335/W-103 GROUND FLOOR - WATER SUPPLY LAYOUT
335/W-104 MEZZANINE FLOOR - WATER SUPPLY LAYOUT
335/W-105 FIRST FLOOR - WATER SUPPLY LAYOUT
335/W-106 ROOF FLOOR - WATER SUPPLY LAYOUT
DRAINAGE DRAWINGS:
335/D-001 DRAINAGE GENERAL NOTES
335/D-101 SECOND BASEMENT FLOOR- DRAINAGE LAYOUT
335/D-102 FIRST BASEMENT FLOOR- DRAINAGE LAYOUT
335/D-103 GROUND FLOOR - DRAINAGE LAYOUT
335/D-104 MEZZANINE FLOOR - DRAINGE LAYOUT
335/D-105 FIRST FLOOR - DRAINAGE LAYOUT
335/D-106 ROOF FLOOR - DRAINAGE LAYOUT
335/D-107 DRAINAGE STANDARD DETAILS
ELECTRICAL DRAWINGS:
3351E-001 ELECTRICAL GENERAL NOTES
3351E-101 SECOND BASEMENT FLOOR- LIGHTING LAYOUT
3351E-102 FIRST BASEMENT FLOOR- LIGHTING LAYOUT
3351E-103 GROUND FLOOR - LIGHTING LAYOUT
3351E-104 MEZZANINE FLOOR - LIGHTING LAYOUT
3351E-105 FIRST FLOOR - LIGHTING LAYOUT
3351E-106 ROOF - LIGHTING LAYOUT
3351E-107 SECOND BASEMENT FLOOR- POWER LAYOUT
3351E-108 FIRST BASEMENT FLOOR- POWER LAYOUT
6
EFTA00803346
C kjarchitecture interiors
3351E-109 GROUND FLOOR - POWER LAYOUT
3351E-110 MEZZANINE FLOOR - POWER LAYOUT
3351E-111 FIRST FLOOR - POWER LAYOUT
3351E-112 ROOF - POWER LAYOUT
3351E-113 SINGLE LINE DIAGRAM
TELEPHONE DRAWINGS
335/T-001 GENERAL NOTES
335/T-101 SECOND BASEMENT FLOOR TELEPHONE & CATV LAYOUT
335/T-102 FIRST BASEMENT FLOOR TELEPHONE & CATV LAYOUT
335/T-103 GROUND FLOOR TELEPHONE & CAN LAYOUT
335/T-104 MEZZANINE FLOOR TELEPHONE & CATV LAYOUT
335/T-105 FIRST FLOOR TELEPHONE & CATV LAYOUT
335/T-106 ROOF - TELEPHONE & CATV LAYOUT
FIRE FIGHTING & FIRE ALARM DRAWINGS :
335/F-001 GENERAL NOTES, STANDARD DETAILS & BUILDING SECTIONS
335/F-101 SECOND BASEMENT FLOOR FIRE ALARM LAYOUT
335/F-102 FIRST BASEMENT FLOOR FIRE ALARM LAYOUT
335/F-103 GROUND FLOOR - FIRE ALARM LAYOUT
335/F-104 MEZZANINE FLOOR - FIRE ALARM LAYOUT
335/F-105 FIRST FLOOR - FIRE ALARM LAYOUT
335/F-106 ROOF - FIRE ALARM LAYOUT
335/F-107 SECOND BASEMENT FLOOR- FIRE FIGHTING LAYOUT
335/F-108 FIRST BASEMENT FLOOR- FIRE FIGHTING LAYOUT
335/F-109 GROUND FLOOR - FIRE FIGHTING LAYOUT
335/F-110 MEZZANINE FLOOR - FIRE FIGHTING LAYOUT
335/F-111 FIRST FLOOR - FIRE FIGHTING LAYOUT
335/F-112 ROOF - FIRE FIGHTING LAYOUT
NC DRAWINGS :
00C-001 GENERAL NOTES & STANDARD DETAILS
00C-101 SECOND BASEMENT FLOOR- NC & VENTILATION LAYOUT
00C-102 FIRST BASEMENT FLOOR-NC & VENTILATION LAYOUT
00C-103 GROUND FLOOR - NC & VENTILATION LAYOUT
00C-104 MEZZANINE FLOOR - NC & VENTILATION LAYOUT
00C-105 FIRST FLOOR - NC & VENTILATION LAYOUT
00C-106 ROOF - NC & VENTILATION LAYOUT & EQUIPMENT LAYOUT
00C-107 EQUIPMENT SCHEDULE
7
EFTA00803347
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 05f61b55-5eb7-4a68-b901-c599236b2caa
- Storage Key
- dataset_9/EFTA00803341.pdf
- Content Hash
- 5182537d726f30fbf5b3499f7891bf87
- Created
- Feb 3, 2026