Carpentry Work
t 2 months work - set price to complete further work and inventor
and work on woodshop
Dock Box top and seat at Dock
Refurbish seat hinges and lid - Complete
Replace end pieces and refinish tabletop - Complete
Master Bedroom
Sliding doors need adjusting - Complete
Install self closing hinges on water closet door - Complete
Dock Boxes at Pools
Replace hinges and Rams on both - need to review
Pool Cabana
Install self closing hinges on toilet door - Complete
Shutters Main Compound
Adjust 6 hurricane hooks - Complete
Add 15 mini exterior hooks - Complete
Adjust eyehooks bedroom 4 entrance - Complete
Beach Office
Weather Proof, Replace Rotten Stair - in progress
Installation of New AC and Housing
Enclose existing fiber feed and switch - Complete
Hurricane Bars
Fabric shelf for Hurricane Bars - Complete
Dock Carpet
Replace existing - awaiting carpet
Install on Jet Ski Dock - awaiting carpet
Engineering Gates
Fabricate latches and securing rods - in progress
Daisy the Cow
Repair broken leg - Complete
Steel Shed
Removal of existing bolt patterns & installation of new
EFTA00584500
Barge
Loading Chocks - will start when Barge on LSJ
Engine Hatches - awaiting electrical work to be completed
Gym
Replace Front and bathroom exterior doors - Complete
Punching Bag replace - awaiting direction JE
EFTA00584501
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 05d3e02c-ee37-40b7-a638-db7fe9e54c9e
- Storage Key
- dataset_9/EFTA00584500.pdf
- Content Hash
- 4d69edec6d68500200ab2ff9e3b21fd1
- Created
- Feb 3, 2026