JE Punch List — Sept 14, 2012 — Danny's Updates
1. Clean Up - make as many barge runs as necessary
2. Equipment and Vehicles
- Sell equipment
- No machinery off the island unless approved
- New seats for gators and pro gators — ordered, 2 on back order
- Remaining 2 Queen Seats — sailing 9/19
- Power Steering Module for Polaris Bike to be ordered — 9/4
3. Computers/Phones
- 25 inch I Mac Clean Up — in Captain's Office — COMPLETE
4. Five Palms
- Exterior Door Shutters —installed 9/6 - COMPLETE
- Painting - outside to be completed via JE direction — Danny to schedule -1J and Gerry
- Furniture — outside furniture in place — Karen to tie down cushions to resolve wind issues, work begins 9/7
- Picture Frame — measurements forwarded to Sarah - 86 x 70
- Mirrored siding —section that fell off reattached 9/14
- Piano — retune in October
- Transformer Shed — roof complete - painting 90% complete — door construction pending
- Fiber Work — Jermaine submitted (2) quotes for the re-pull of the fiber from the generator junction to Five Palms 9/14
— Daphne will forward to JE and Karen for review 9/14
5. Grotto
- Mattress cover —JE approved buying fabric, making cover locally
- Genset wiring — COMPLETE — Electronic Remote Starter, auto start from Kite House — on site — Danny will install after
outside lighting project completed
6. Berm/Top of Hill
- Hydroseed outside — in progress
7. Triangle -
- Must design triangle — awaiting JE direction
- Weed and Hydroseed entire area - weeded — hydroseed week of 9/17
8. Flagpole Pool Cabana
- Furniture — desk from Paris ready to ship early September - Sue
9. Floating Dock
- Jet ski bumpers — complete — reviewing whether this type resolves the issues with the jet skis
- Table/Dock Box - Dock box top to be revarnished — Carlos has a possible solution
- Swim Ladder— direction from JE on placement required
- Dive Platform — require construction details
10. Chillax Room
— requires furniture piece for electrical/media equipment — Sarah
11. Chillax Bathroom
- require blue rugs for bathroom & vanity area — Sarah
12. Mechanical Building Transformer —on STT 9/11 — will schedule pick up week of 9/17
13. Boats
- Lady G — sell — in hurricane storage 7/18
- Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000
- Big N — repair — at AYH dock — Danny working on bids for remaining punch list items
- Little C — engine installed 9/14 — launch and diagnostic testing by Offshore Marine 9/17
14. Timers
- Review installing timers on air conditioners, irrigation water systems, and lights
- Set all air conditioning to 80 degrees EXCEPT gym, guest rooms, and storage areas — they remain at 85 degrees
- Irrigation — depending on rainfall
EFTA01107302
15. Beach lighting — per JE, replace existing transformers for the beach lighting of palms around the salt pond and
beach — in progress — 70% complete - completion by 9/21
16. Transient Surge Protection —JE approved to purchase — will order 9/4
17. Landscaping — Peters List
- Pop's Garden — need deer fencing, or some other method of protection, review of shade cloth
- Clean mess, cut grass; trim all vines, acacia — owner's drive, blue beach, gym — work in progress
- Peter to clean the sides of the road — work in progress
- Black under pads used at Heli pad to be installed at top of bike path at Main Compound
- Installation of additional soil and sea grape for engineering area — soil installed and hydroseeded
- Hydroseed all pull box areas & engineering
- Continue to line all roads with stones
- PR Coconut Palms —JE approved the purchase of (5) 12' and (5) 15' palms - order placed 9/14 -wire sent 9/14 -
scheduling for sailing on Friday 9/21, EDA on STT and LSJ 9/22
18. Roads
- Priority is Gym road grading — remove sand and re-grade —week of 9/17
- Jules to work on road to pebble beach — COMPLETE
- General re-grading of roads — ongoing - Peter
19. Library
- Lights on bookshelves need attention — COMPLETE
20. New Employee Bathrooms
21. am
- New punching bag — on site — installation after JE visit
- Subwoofer — torn/blown, Larry ordered part, shipped to NYC - estimate install by Sept 7-10 (Scott's update as of 8/30)
- Windows in the ballet room need repair to both cranks/panes — COMPLETE
- Plant gym beds — COMPLETE
22. Beach Office
- complete electrical overall required
- waterproofing/sealing/painting/replace rotten wood required
23. LSJ Mooring— Darren forwarded to Army Corp for final approval — awaiting response
24. Hangar
- Fuel Containment Pad — draft approved with drainage incorporated —surveyor will complete survey by 9/18-19 and
forward to the architect so he can complete the plan by 9/21and submit to DPNR for permitting week of 9/24 (Cecile's
update as of 9/14)
25. Main compound
- Wind doors to the east are inoperable — change hinges - on site — completed by 9/6
- Lights — as of date all are up and running —there are still some missing bulbs, which will be addressed as time allows
- AC —Above Great room, reroute drain from roof line — ARS on site 9/13 - COMPLETE
- Projector Screen — new limit switches and motor required — Danny will review 9/17
26. New waste bins — signs have been ordered - COMPLETE
27. Yellow Nap House — demolition and removal completed 9/5
28. Blue Nap House — replace and repair shingles — COMPLETE 9/14
29. Steel shed — ESCO Manufacturing (PR) and Buck Steel (FL) quotes submitted for review
30. Equipment to be Purchased — (1) light generator, (2) arms with lights to be hard wired, (1) skid steer — at Tropical —
sailing 9/19, (1) John Deere box and blade, (1) man-lift, (1) golf cart —at Tropical 9/17 — sailing 9/19, (1) dump truck
31. LSJ Mats —for all locations to be ordered 9/4
32. Engineering— Old building roof painted - COMPLETE
33. Stone Walls — Repair work to replace missing loose stones — Gerry & T1— Danny to schedule them
34. Solar Lights — installation placement via JE's direction completed — per Peter, JE does not like the "white light" —
likes a "soft white" light —JE to advise
EFTA01107303
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 04094924-0baa-4b3d-ba37-1a4da870b56f
- Storage Key
- dataset_9/EFTA01107302.pdf
- Content Hash
- 696dd03d863b56e43000de1409dca211
- Created
- Feb 3, 2026