From: Richard Kahn
To: "Jeffrey E." <jeevacation@gmail.com>
Subject: prosolar
Date: Fri, 07 Sep 2018 20:01:24 +0000
maybe brice emails about solar being down were to cover himself with excuse as no one was staying on GSJ
there games and lies are exhausting..
Richard Kahn
Begin forwarded message:
From: LSJ GSJ .Ic a
Subject: Re: Friday June 29th
Date: Se tember 7, 2018 at 3:55:09 PM EDT
To: < >
Cc: Dan Prosolar >, Marcelo < >. Brian
Walden >, Brad Spernak < >. michael
glidden >, Richard Kahn <
Good Afternoon to All
As of time and date system is up and running
I will review again later this evening and give an update to all
Warmest regards
Karen
On Sep 7, 2018, at 1:22 PM, > wrote:
Karen
Please advise if solar grid is maintaining load on GSJ
Thank you
Sent from my iPhone
On Sep 7, 2018, at 10:54 AM, Richard Kahn <i > wrote:
EFTA01024031
is solar back up?
if so please advise what issues were..
thank you
Richard Kahn
HBRK Associates Inc.
On Sep 5, 2018, at 7:22 AM, > wrote:
Morning
Same issue no power again
Sunny islands dead
Sunny boys flashing yellow
Please as to what you would like to do
Brice
Sent from my iPhone
On Sep 4, 2018, at 12:11 PM, Dan Prosolar < > wrote:
good morning all! hope everyone had a great weekend.. minus GSJ with no power.
i feel very good about my visit today. i was receiving error codes pertaining to an OVER-VOLTAGE situation. this is great news
considering we have been fighting the opposite problem since the hurricanes. i have had the system set to perform at the absolute
peek voltage it can to avoid loosing power. this maximum voltage setting teeters the system on the edge of its capabilities. as we
see now it has obtained and exceeded its voltage setting limits on the sunny islands. there is no damage done, only the
inconvenience of it shutting down to protect itself. Today i throttled back the target voltage by Iv. this should prevent more
shutdowns due to over voltage. i think we have got this system dialed in.
All the best, Dan Chrisman
On Mon, Sep 3, 2018 at 6:57 PM, > wrote:
Good Evening
The solar system is down on GSJ
No power Sunny islands
Sunny boys seem to be in alarm
Cluster box no power
Please advise as to Dans schedule
Regards Brice
Sent from my iPhone
EFTA01024032
On Jul 11, 2018, at 2:10 PM, Marcelo > wrote:
Good Afternoon Richard,
Please see the below email containing Dan's summary of what actions he performed on his last visit
to GSJ.
Regards,
Marcelo Perez
Project Manager
<401A334B1BB040DOBBA29AA3089AB844[431569].jpg>
www.prosoiaramerica.com
From: Dan Prosolar
Sent: Wednesday, July 11, 2018 1:10 PM
To: Marcelo
Subject: Re: FW: Friday June 29th
Good afternoon all, sorry for the delay my email had an issue and became unlinked so I wasn't
receiving these untill now. Regarding GSJ here is what's been achieved.
-all Aquion battery modules are wired to bypass the corroded, water damaged circuit boards that
could interfere with charging profiles.
-sunny islands (6) were downgraded to firmware version 6.0.02. This was done to allow a
broader, linear charge profile to be set
-charging parameters are now based on voltage set points rather than state of charge calculations
done internally with different references.
EFTA01024033
-max charge voltage has been set to 58.5V and the batteries will not stop charging until! a
voltage 1.5V over the set limit is a achieved for 15 seconds. This gives them the ability to
serpase the previous charge voltage of 56.7V
- the main issue that caused so much down time before was as follows. A target charge voltage
that matched the Aquion batteries was not possible with the previous profile. Compiled on that
was faulty Aquion circuit boards preventing the batteries from properly charging to a suitable
voltage. Aquion, as we know, is no more, so it's impossible to obtain replacement parts. Aquions
bms never met the as advertised performance and created more issues than we could have
imagined. In short, the changed I made allowed for a higher, more suitable battery voltage to be
achieved and prevents the premature shut down we saw before.
Again, sorry for the delay, hope all is well
Thanks
Dan Chrisman
Senior Technical Specialist
Prosolar LLC
From: Richard Kahn
Sent: Wednesday, July 11, 2018 10:30 AM
To: Brian Prosolar
Cc: Brad Spernak; michael glidden;
Subject: Re: Friday June 29th
can we do thursday morning or anytime friday
when can expect Dan's summary?
please advise
thank you
Richard Kahn
HBRK Associates Inc.
EFTA01024034
On Jul 10, 2018, at 2:18 PM, Brian Prosolar wrote:
Afternoon Richard,
Brad is traveling to San Francisco for a conference and I'm boarding a plane to STX. I've
asked Dan to write a synopsis of his efforts and we have been monitoring for proper
function. I'll relay this tomorrow once he's finished.
We're still evaluating but all is functioning as intended for the moment. Additional
monitoring and confirmation are needed since the weather over the last week has been
extremely cloudy.
Would it be possible to have our call on Thurs. afternoon at 3 EST?
Regards,
Brian Walden
ProSolar America, llc
Director of Operations
On Jul 10, 2018, at 1:50 PM, Richard Kahn < wrote:
i have not yet heard back from anyone on a time to speak
please advise
thank you
Richard Kahn
HBRK Associates Inc.
EFTA01024035
On Jul 9, 2018, at 5:36 PM, Richard Kahn < > wrote:
can we please arrange a call for tomorrow to review current status of GSJ solar
thank you
Richard Kahn
On Jun 29, 2018, at 1:36 PM, Brian Prosolar < > wrote:
Afternoon Rich,
I believe the normal boat arrival time is 8 or 8:30 a.m. in Redhook.
Dan will be there.
Regards,
Brian Walden
ProSolar America, llc
Director of Operations
On Jun 29, 2018, at 1:20 PM, Richard Kahn < > wrote:
EFTA01024036
please confirm what time you will be arriving at GSJ on Monday
thank you
Richard Kahn
HBRK Associates Inc.
On Jun 28, 2018, at 1:42 PM, Brian Prosolar < > wrote:
Afternoon Richard,
We're still trying to have a final discussion with Stefan as well as track down
multiple 128MB or smaller SD cards to reboot the Sunnyboy inverters. We're
moving as quickly as we can in order to execute the conversion plan but it looks like
we have to push to Monday. Dan has shown Michael how to get the system back up
and operating in the event of it dropping offline and that is working for the interim.
Regards,
Brian Walden
On Jun 28, 2018, at 11:08 AM, Richard Kahn > wrote:
please confirm that you will be at GSJ tomorrow to work on the Solar
thank you
Richard Kahn
HBRK Associates Inc.
EFTA01024037
On Jun 25, 2018, at 7:27 PM, Brian Prosolar
wrote:
I want to ensure we have the PCB bypass discussion with the engineers prior to
the visit and will try to expedite.
Brian Walden
EE/RE Consultant
On Jun 25, 2018, at 5:05 PM, Richard Kahn < > wrote:
we are without any solar currently
can you please try to have dan come sooner
thank you
Richard Kahn
HBRK Associates Inc.
On Jun 25, 2018, at 4:31 PM, Brian Prosolar <
wrote:
Afternoon Richard,
I have Dan on the schedule to head to GSJ on Friday.
Regards,
EFTA01024038
Brian Walden
ProSolar America, LIc
Dir. of Operations
On Jun 25, 2018, at 3:30 PM, Richard Kahn
wrote:
can you please advise when your men can come in and fix our solar system
thank you
Richard Kahn
HBRK Associates Inc.
<401A334B1BB040D0BBA29A A3089AB844[43 I 569] jpg>
Prosolar Systems
Let's Get Social
EFTA01024039
C~.5.5.~
EFTA01024040
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 027a79d6-77f3-43d6-a613-3a80bb508ed7
- Storage Key
- dataset_9/EFTA01024031.pdf
- Content Hash
- 48444e90db51e7e1601e377b1c8e5246
- Created
- Feb 3, 2026