EFTA02677924.pdf
dataset_11 pdf 823.9 KB • Feb 3, 2026 • 12 pages
CNY Construction Management, Inc.
General Contractors / Construction Managers
6
rCenTr'( Til
CONNSTRUCTION
MI III,
Job Name:
Location: October 21, 2013
Architect: Bid Summary
CSI Trade Budget
Code Proposal
00 72 00 General Conditions (12%) $ 85,510
00 73 16 Insurance (3%) $ 21,900
02 40 00 Demolition $ 25,000
06 20 00 Terrace Decking and Bench $ 12.000
06 40 00 Architectural Woodwork $ 102,150
08 10 00 Closet Doors - Allowance $ 14,850
08 50 00 Window Insulation NIC
08 70 00 Hardware - Allowance $ 14.300
08 80 00 Glazing - Allowance $ 2,100
09 20 00 Plaster and Gypsum Board $ 2,000
09 30 00 Stone and Tile - Allowance $ 83.122
09 60 00 Sand, Stain and Finish Existing Floors $ 18,000
09 62 00 Carpet $ 1,500
09 64 00 Parquet Floors $ 1,500
09 90 00 Painting and Coating $ 66.110
10 20 00 Bathroom Accessories - Allowance $ 18,100
11 31 00 Residential Appliances - Allowance $ 22,000
12 20 00 Install Draperies NIC
12 40 00 California Closets - Allowance $ 70.400
22 30 00 Replace Kitchen Sink and Bath Fixtures $ 29,850
23 30 00 Wall A/C Units - Allowance $ 16,000
26 00 00 Replace Receptacles. Switch Plates $ 7,000
26 50 00 Lighting Installation $ 11,350
Subtotal $ 624,742
Overhead/Profit (17%) $ 104.300
Construction Total $ 729,042
EFTA_R1_01974085
EFTA02677924
Qualifications and Notes
1 - Bid based on owner providing capital improvement certificate.
2 • Bid based on non union labor
3 - Asbestos, lead, mold or other hazardous material removal not included.
4 - No associated air monitoring or testing costs included.
5 - No building department filing fees included.
6 • Owner is responsible for providing utility service to space.
7 • Temporary heat not included
8 - Alarm systems not included.
9 • Audio /Video systems not included.
10 - Control and low voltage wiring not included.
11 • Window treatments to be provided by others.
12 • All extra work and change orders are subject to cost plus 15%.
13 - Owner supplied subs are subject fo a coordination fee. Percentage to be determined.
14 - This project will be left in clean condition. Detailed hand cleaning by others.
15 -Any repairs to existing conditions other than that described in the scope provided not included.
16 - Hoisting of all material and removal of debris will be done by use of existing elevator.
17 • Close out documents. Including warranties, sign offs and etc., shall be submitted upon finalpayment.
18 - Skim coating of existing walls not included.
19 • This proposal is good for 30 days. After such time prices are subject to change.
20 - Controlled inspections not included.
21 - Mock ups not included in this proposal and will be billed as a reimbursable expense.
22 • My items that appear after finalpunch list has been determined and agreed upon are considered warranty items and will be handled as such.
23 - All appliance and fixture pricing is good for 30 days from date 010^3POSat
24 - Change Orders not subject to retainage.
25 - Items that am not specified are assumed standard. Any upgrade from standard will result in additional charges.
26 - Preparation of "As Built' drawings not included.
27 - Contractor will not be responsible for touch ups or clean ups after owners move in company.
28 • Maintenance of HVAC and mechanical systems not included.
29 • Lighting fixtures will be provided by owner.
30 - An allowance of $22,000 is considered for the kitchen appliances at apartments 8A, 10B. ION and 116.
31 • Closet doors considered to be hollow wood.
32 - Work considered to be done in two phases (Phase 1 - 8A. 10B, 118. 11P. 11J: Phase 2 - 2G. 3M, 8H, 10F, 10N)
Please do not hesitate to call if you have any questions.
Regards,
Carlos J. Guzman
Estimator
EFTA_R1_01974086
EFTA02677925
CNY Construction Management, Inc.
General Contractors/ Construction Managers
623 West 51st Street - New York, NY 10019
300 Naas
Lotatkint Oetebe 22 2011
ANNINA: Apartment 2G BM ensalerlown
est WIN !Mit 70404
OMANI I Code ray*, DescrIpdon I Ott Unit Rea I IIIINNIIN Socfon tAVItien
01 GENERAL. REQUIREMENTS $
01 3000 ActininIstrylHe Roquiretnenft $ •
Pretect Manager 3 wk see summary see summon.
5110 $95*, 3 wk no sunvnary too sumenaV
02 EXISTING CONDMON5 $ 2.500.00
020000 00entAltIon S 2,50000
OtrraNOsrr 1 It $ 2 50000 $ 2.50000
Roma, nom, Cannes 20 If
Remo., moor Conn 2 sus $ -
06 19000. PLASTICS AND COMPOSITES 2 21.000 00
06 4000 Arch t*NNW WooSayelt $ AMP)
KNOW CANNINO • 200 I es $ 11.200.03 .5 11.20000
Office Hoot - I N 1 Is $ 1250.00 5 125000
Recktir Caws • 24 0 1 It $ 4T5000 $ 5.150.00
00 FINISHES $ 24.10000
09 2000 Naar and 039tuen Iktat0 S 2.00000
Mrs GIM3 ANNAN 1 IS $ 2.000.00 $ 2000.00
095000 TIN 5 1220.00
Slone Cam/atop 20 • $ 225.00 .5 546000
Wham Subway /04 00d40041 40 0 $ 21.00 $ 1,12000
IlAnctoot Synch 3 8 S 550 00 $ 324000
09 0000 NootIng $ 540000
Sand, Wen an0FfrilthEnNing Abel: 900 sf $ 100 $ 540000
099000 Panwhmt And Cement, S 911000
PAW Al WAWTIWurymak 1 It $ 9.11000 5 9.110.00
12 FURNISH/NOS $ 1/.013000
12 40 00 C4M0ralst C104019 $ 11,059.00
CsAtorrve C10.9.41 5 as $ 2.20000 $ 11.000.00
22 PLUSSING 1.55000
22 00 00 MINNININ7 N91INWONni $ IMO 00
Ham Mew SvA I it S 1.550.00 3 1 $50 00
23 HVAC S 200000
233000 HVAC 4.0 Dinning/on $ 2.00000
woe Unit NC 2 ea S 1000.00 $ 2,00040
26 ELECTRICAL $ 350.00
26 5000 LASHIng 5 35000
MHO ony Now Trio tiannnetm I hNg Ran f 0 $ 350.00 $ 350.00
3 of
EFTA_R1_01974087
EFTA02677926
CNY Construction Management, Inc.
General Contractors /Construction Managers
623 West 51st Street New York, NY 10019
Job Wawa:
Location: 00:062t 2013
Atow0rot Apartment 3M N 160014own
Unit Ise Sabo
Whim I Cot I Trodo /Dieception I Ott I 004 4100 MII•NMI do/lea 065061
111 GENERAL Re01/1RZAIFJ173 $
013000 AMMMstraMm Requllenems $
Orqem I.M..y• 4 we NO tansy on lOmmkr1
,t, s+.1." 4 al PH fir444IMI In Ranow4
01 LIAMNGeorsornons s 2600 00
02 4000 Ornelatelt 5 260000
Clancapn 1 Is $ 2.50000 $ 250000
Ramon tans, Coatts 15 X
Remit itacitta Casa 2 44 $
bra.. tbsel 00444 4 40 5
Remove flatIrOom Mom Tao 35 al •
00 W000. 16.6511Ct ANO COMPOSITES $ 1010000
044000 AteMectal Woodrow. 6 10 10000
66140406044, 6614 • r4 it r 6 5 4009 SO I 4.00404
ariarrowe NMI; - 30 I M I 100000 4 101000
ettOrrob Sante 5 I It $ 1.50000 I 1.500021
10•6644 Cobb • 20 v I b 5 160001 .5 260000
a 011945003 $ 210000,
011000 bows end I raw $ 4.35000
164464 4606006 1 44 $ 236000 $ 233060
Saki Moen, 000n NUMMI. 4 44 5 60300 5 260000
06 7000 154446•64 5 215000
1444/mire 6 a 5 66000 4 2 700 00
It b14101,5 1 2005600,
06 3000 to $ 774200
Woo Cavolmo0 16 X S 27000 5 4.12500
Kale Socagtsin 30 0 $ 2500 4 010 00
51104 564 44 8•660444 35 44 3 2600 5 00000
Rapti, IIIMMOOrm 200 it 5 00) 5 160000
0,0000 FICOMMI $ 107000
See S1444Irera Faun Cason Flan 000 0 5 500 5 1600.00
010000 Abbang owl Cablio 6 0 06000
PamI AVMS! Math I4 I M $ &MOO $ 105000
IS SPECMLI1E3 $ 1 201100
10200 lades Spot-410e $ 110000
Now BoOvocm141nOr* I mI $ 1.20000 S 1.2000
1: FUR446451605 $ 000.101
114000 FebrIsMng end Aceamerles $ 0600.00
[Mtn* CAPP1141 4 ot 3 220000 S 2.3000
22 PLIAVOINO 5 1050,00 i
1130 Al PlawabIngimmlimmme $ 10:000
Ker. 54* I 00 $ 166000 4 1.56000
YIN, SAY I Mt $ 100001 4 1.60000
33 141145 I 2.00000
11200 NVAC At 044610ellen $ 2.000.00
WO (Int AC 2 .4 $ 1,003 CO $ 200000
N ELlCIIeCAL 5 1.00000
155000 UM6460 $ 100100
6b1010.9 Cobb 1•16,44•6 44044 561614 .1 et 5 25000 5 1,00000
EFTA_R1_01974088
EFTA02677927
CNY Construction Management, Inc.
Genteel Controls / Construction Managers
623 West 51st Street • New York. NY 10019
JeliNse: Apsetrest
Lam 0/66.. 22. 0313
MSC Apartment 6.4 1,624.66
*WO
Ode Tr.* 0.1. Ia6 Ia»I
MAN U6 15
"lapel Mons r . v.* OM Santry MO Mai•I rare
.6 2 ma me mend". easeassnr
42 6#2Y.D etude t EST
02 0001 I 2.50220
2..."- LOW 2 2,520
.. m.. cam II 1
I C 2 gm 3
nava hay,
6.66,• Ilarocn 1,....es et
00 00 00 teSeestrom t 0x000
-.ens..1>6 1 6 t 5
I 6 S I62100 S t(0200
/ 6 S 100000 5 100000
MP 0•00/4S t 519100
0. f0 00 Dotes 6,4 Fess II 1.1000
rrNrc.i&re, 02.00t 2 M $ eauke 5 I.0Ob
00 7000 Iresseas• 5 twee
,,,t1.•291 I 44 S 61440 S IMO 00
*NO 1b.m. I 210360
0,66 Peelts co ens 21 II S 10100 S 210000
MMM 2e. S 502200
02 WM Away S PIKOCO
Soil Mos weenie Sven PA 0 S OOP 5 I ON PO
AMP PeN0agwalCs.42, t 600200
Peva.' 22020 ylv I le S SKOOP S 520009
NaM Sten>4.t.0 1
vIII
.. Fr.
€ 4." P.....
.. ME I
rr 2190 R.S03000 APP•00400
.:;,. f 490000
OE Sims I es t 130000 t LW 03
OE eienwase I •• S IMO. 1 I.0IP PI
12 RIIIIIIMMIS 2 £00600
flan .6,44Leensaits f 61000
c,,,,,,,, 0,,,,,
2 IMOM
23 3000 AMOCO
1 I.
nee Sea I •• t 113000 S LOW OD
001,
aeon I " S lig:
WY us. PC ea il I MGM t I 0206/
■ flIACMICAK S 5101.0
if/000 100090/ I NOM
ma YamsMei Imam CO S
66000
EFTA_R1_01974089
EFTA02677928
CNY Construction Management, Inc.
General Contractors /Construction Managers
6
Job Nast
Lotaisa• Oerowri 2013
Atclwftc1: Apartnnant 811 IN IN•sic1owes
Ms NS Tails
DIvIsion I COS I YAM I IlamMIlen CNY I Mail lises
Uall I Amax* &Palm OhlsIon
01 011A MAL M *
01 30 00 ANwinasballre IlmulnIMS001
Plow. Minna 4 - .« ..44440( SOO SalmtrY
Si. Sore 4 Val PIP .amM a.. stanniNY
02 IMMO CMCITION5 S 250000
A 40 00 MaisMIon S 1600.00
twasMon t Is S 1.60000 * 2500.00
RIMOI• Maven Cabinets 20 N incloSNI ..OLIN
noexvo R•Soro, Cows 2 40 NOWA alio.'
Rosex• Stone Run) 1/04•0010. 30 sl _olaNalld_ mcluded
OS 11000 PUS= •1I0 CONOOSHIS S 57.00000
M 2000 Rash CAPP000 S 4MOOD
Wady 7•41 Batch at 44404 I is 4 400000 # 400000
Woace N44104044 Lienm2 al Poe IS st i WOO S Z f 0000
04 40 00 Archilectsr•IWoodwar. S 11000.01
Kolaun CalOmte • 20 I 1 N $ 10,00000 * 10 000 00
Meksh:.i Coven • 20N 1 Is 5 f0000 $ 360000
00 IIMSHi$ $ 57,42542
00 30 00 TM 5 7 42502
510.10 040444 it A/ 14•100.44 23 9 * 27500 S
MTN 1.0 at Maws ainOver 4 4 S 27500 S 1.10000
00 0 00 Paean 5 1.50000
No* CAT40 or bacon, - 75 sY I es 5 1.50000 $ 1.50000
00 64 00 Wood Fisoetno S I.500 02
No* Pamust Han Varlet* - 30 V I Se S 7.50000 3 1.50000
MAW Plelnalg sap Cornea $ 7.00000
Pan Waft Tivairout I is S 7.00001 5 700000
12 IVONmIIr4as S 00000
124000 Ambits M0A0.04,40M0 S 0800.00
CanomuCatoolf 4 oa S 220000 I 050000
A INAC 5 200000
n so 00 r AC AI4 Ob0404,60a
WO Una AC I 2 I N IS 7.03100 IS ₹904001
$ 2000.07
EFTA_R1_01974090
EFTA02677929
CNY Construction Management, Inc.
General Contractors I Construction Managers
Job
toc40.. 041000. 22 103
Architect Apartment 109 Proaa4lowo
Ww I N.. 1
OMsMe I Cel t 1 Tra04/ Onenpnce. I 4.,' Lsael AO* Seetiew Dirras.-
01 GENERAL REQUIRENENTE 5
01 3000 IlemnatrOhnitapidnemon0 S
I imwq P.n.s 4 . ea aueerftry Noe seenleY
See Satpw 4 ra* lo• *annoy ewe suAenay
Ill IMMO COMMONS 2.10100
t,..., cw..0 10 exAded a
honey. R5oew Cr.., 2 ea evatlat. vsehAINI
Ram... flees 0l( 5 is ealds4 inuisAid
hrr, sinvoc„.„, an , ta orArkaf .31.41.
91 WOOD. ikAincs Am CONICIITES S /I µ03%
W400.0•44 3 It40000
Woe,. Cann . :Of N I date $ 60200
flag... Cann 14 /1 I la 5 26000 1 140105
M0 uni Viet ...0 I Is I 1.0:04,0 $ 1.00200
N OREIE•10$ 1 &2W0
051000 Own as1/...5 S 25000
5.3•4 144a50 Own YUMAN 5 ea $ 50050 I 26002
002000 1.0.0.a. 1 2 MOO
S ea $ 55240 5 226290
at Masan a 111515.00
DI .10 40 MI 5 4 S7502
Sow Coati.. 10 II S 27590 5 2 7500.>
Inta. SY 15 II 5 MOO • 011150
00 1000 RafraIlem es1Coans S 7 00000
Pas Wall 15..0“ 1,1 5 la S 7.00000 1 2.02)0t)
10 SIECIALTIES $ I 7X a:
50 MOO s., SAN A., S 02.202
Noe Reartom Merv., I de 5 1.}p00 5 I.2000)
New GelsPea, I ea 5 150000 I 339040
If 105 1 S 3502%
II 31 00 Ibisidallal AosIewaya 1 55W®
0.40.0*. / . 5 250100 1 2 V4 00
GE 550..• I . 5 1.50000 I 1.%002
OE Oates., I .5 1.5(0001 IWO&
12 PUlt/220•21011 5 ',scow
15000 FaesisNato 1 EIA”50
Catena Carty • ... • 2 20000 1 A VA• 00
PIUS. I .55003
n1000 Pitaitintifauemani I •55000
16.er, S. I . S 156200 1 155050
N5,4 , 1.0 I . $ 1.50000 5 1,500
Tutts I . 5 130001 1 i VA2 CO
23 NVAC 1 owes
233000 WIC Ai 0011twee 1 200000
MO .P.A. AC 2 5. 5 105000 1 200000
ELECTRICAL 1 I 00a 0)
00 1000 WANG I 5.00000
4,tel at C.A.!, *owed tole luso. • ta 5 26250 5 1.0 00
EFTA_R1_01974091
EFTA02677930
CNY Construction Management, Inc.
General Contractors /Construction Managers
623
Job Name: Aitwknord Reetanurtn
Lista OtlObNll, 2073
Newt Apartment IOF Sk1Ilmslroown
ls
OlvIslon I cod.
Cs1 I IMS• I Ommtp4lon 016, Usti lisfe
a'll I Ansmit Swam TolaOtrIsMa
01 GENERAL MaA11fYtNM $
01 30 00 AOminasbalibb filmuismsab $
Piggy Wows, 4 Ms en anW.i NM SiiinntaY
Si. Sore 4 var In Irganillin, an stannimv
03 g324O40 COMOIT/Qt43 S 300000
024000 dandira S 300000
Oaromon 7 is S 100000 S 700000
Remo.. Cat.nee Fiat es indu0441 inclusind
Rom. tub to MOJOYCI ft rliwied
Mown gammon tans es f •
OS 11000, 'LAS TICS MID COMPOSITES $ 10.000 00
00 20 00 Rash Csomaby S 000000
Out1000 lea BOVA et N1100 I Is 5 000000 2 000000
Woad karnovaar Doom2 M Mow $5 4/ 3 SAW S £10000
00 a 00 Ambisrcturfleec1wor* S mimeo
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 022fb70f-e208-4a3d-844f-5611abe1c83f
- Storage Key
- dataset_11/EFTA02677924.pdf
- Content Hash
- 1ffab1df2b445235dda3398c5e81e15f
- Created
- Feb 3, 2026