EFTA01190601.pdf
dataset_9 pdf 4.5 MB • Feb 3, 2026 • 79 pages
CAMP 737-72UBJ REVISION 21 S/N 29273 (YG006) VP-BB]
OWNER: PICTON II LTD. OPERATOR: PICTON II LTD.
ADDRESS: C/O JET AVIATION ADDRESS: C/0 JET AVIATION
GENEVA AIRPORT CH-1215 GENEVA AIRPORT CH-1215
PHONE: PHONE:
FAX: FAX:
ANALYST: DENNIS RUFFINI ) (OFFICE)
(EFAX-CARDS)
EMAIL: (OFFICE) (FAX)
PROJECTED : 60 MOS. to 05-AUG-2019
AIRCRAFT SERIAL/REGNO: 29273 (YG006)/VP-BBJ MODEL: 737-72UBJ REVISION 21 MANUFACTURER: BOEING COMPANY
DATES LAST ACTUALS PROJECTED
INSERVICE DATE: 08-OCT-1999 3753:19 NC HRS as of 30-JUN-2014 6273
922 AFL as of 30-JUN-2014 1822
3455:18 APH as of 30-JUN-2014 5855
APU SERIAL/PART: P-5180/3800702-1 MODEL: 131-95 MANUFACTURER: HONEYWELL
INSTALLED ON 25-JUN-2010 LAST ACTUALS PROJECTED
3001 APU HRS 3455:18 APU HRS as of 30-JUN-2014 5855
2487 APUS 2961 APUS as of 30-JUN-2014 4161
ENGINE NO. 1 SERIAL/PART: 874437/CFM56-7827/53 MODEL: CFM56-7627/B3 MANUFACTURER: CFM INTERNATIONAL S.A.
INSTALLED ON 05-MAY-2011 LAST ACTUALS PROJECTED
3556:48 ENG. HRS 3525:36 NC HRS 3753:19 ENG. HRS as of 30-JUN-2014 6273
821 ENC 886 ENC as of 30-JUN-2014 1786
ENGINE NO. 2 SERIAL/PART: 874438/CFM56-7827/53 MODEL: CFM56-7627/B3 MANUFACTURER: CFM INTERNATIONAL S.A.
INSTALLED ON 08-OCT-1999 LAST ACTUALS PROJECTED
44 ENG. HRS 44 NC HRS 3753:19 ENG. HRS as of 30-JUN-2014 6273
15 ENC 886 ENC as of 30-JUN-2014 1786
BOEING AND BM ME TRADEMAPAS OF THE BOEING COMPANY
05-AUG-2014 Due List Report © CAMP SYSTEMS 1 Of 79
EFTA01190601
C O Astant.frar•
MP
NEW REQUIREMENT ITEMS
Operator Review And Action Required
737-72UBJ REVISION 215/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
These tasks or requirements have been added newly to your aircraft status. Please review them and approve or modify as appropriate. Please
pay particular attention to the Base and Next Due Times for these tasks. tt is Important to note that any task that has Insufficient Information
(marked by 7), will never come due unless the necessary information is provided by you.
TASK NO TASK DESCRIPTION EFFECTIVE DATE UNIT INTERVAL BASE TIME NEXT DUE DISPOSITION
Current Change To
EASA 2013-0020 INSPECT THE MARKINGS OF SAFETY BELTS AND/OR TORSO RESTRAINT SYSTEMS, TO DETERMINE IF THEY HAVE BEEN MAINTAINED OR REPAIRED BY
R4 (1) ORGANISATIONS OTHER THAN THE DESIGN APPROVAL HOLDER
14-FEB-2013 MOS 11-JUL-2014d MANDATORY
DUE EVERY HRSIMSC DUE
REF: AD AFL
NEW REOUIREMENT ADDED ON 16../UL-2014 REVIEW BASE TIMES TO ENSURE CORRECT DUE TIMES.
FAA 2014-13-07 INSTALL A NEW TAIL STROBE LIGHT HOUSING, INSTALL A NEW DISCONNECT BRACKET, AND CHANGE THE WIRE BUNDLES (FOR AIRPLANES ON WHICH
PARA (G) SB 737-33.1146 HAVE NOT BEEN DONE BEFORE THE EFFECTIVE DATE OF THIS AD)
19-AUG-2014 DUE NEXT MOS 72 19-AUG-201,1 9-AUG-2020 MANDATORY
NRSIMSC
REF: AD AFL
NEW REOUiREMENT ADDED ON 17-RA-2014 REVIEW BASE TIMES TO ENSURE CORRECT DUE TIMES
FAA 2014-13-10 DETAIL INSPECTION TO DETERMINE IF A WIRE SUPPORT CLAMP HAVING PART NUMBER (P/N) TA0930034.10, TA0930034.10P, TA0930034-11, OR
PARA (G) TA0930034-12P IS INSTALLED, & DO ALL APPLICABLE RELATED INVESTIGATIVE & CORRECTIVE ACTIONS
IS-AUG-2014 DUE NEXT MOS 60 19-AUG-201,1 19-AUG-2019 MANDATORY
HRVMSC
REF: AD AFL
NEW REOUiREMENT ADDED ON ISJUL-2014 REVIEW BASE TIMES TO ENSURE CORRECT DUE TIMES.
AUTHORIZED BY CERT.. DATE
7-Insufficient Information (s) Suppressed Requirement •-EstImated Due (New Requirement) (EB1)-Esdmated Base Time
05-AUG-2014 © CAMP SYSTEMS
2 Of 79
EFTA01190602
qmp Ari•lionfrum the fumtI up'
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MO5. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENM l AN TIME REMAINING
EASA 2013-0020 R4 INSPECT THE MARKINGS OF SAFETY BELTS AND/OR TORSO RESTRAINT SYSTEMS, TO DETERMINE IF THEY HAVE MANDATORY
(1) BEEN MAINTAINED OR REPAIRED BY ORGANISATIONS OTHER THAN THE DESIGN APPROVAL HOLDER
MOS 11-JUL-2014 M NEW 11-JUL-2014
HRSiMSC DUE REQMT
REF AD AFL
NEW REQUIREMENT ADDED ON 16-JUL-2014 (EFFECTIVE: 14-FEB-2013). REVIEW BASE TIMES TO ENSURE CORRECT DUE TIMES.
SB 737-32-1448 TABLE PERFORM LANDING GEAR - MAIN LANDING GEAR - FORWARD AND AFT TRUNNION PIN ASSEMBLIES INSPECTION RECOMMENDED
1.2 AND CHANGE, SERVICE BULLETIN A GENERAL VISUAL INSPECTION OF THE MLG FORWARD AND AFT TRUNNION PIN
ASSEMBLIES WITH THE MLG NOT REMOVED FOR SIGNS OF CORROSION AND/OR CHROME PLATING DAMAGE FOR
ALL AIRPLANES
MOS 18 09-AUG-2011 09-FEB-2013 CC<
HRSiMSC 3533:32
REF BULLETINS AFL 863
WO. Al CHECK VP-88J FEB. 2013. VP-813J DUE LIST JULY 2014. VP-BBJ MONTHLY APR.
05-00014 ACTIVE STORAGE PROCEDURE
DAYS 7 14-JUN-2014 21-JUN-2014 CC<
HRS4MSC 3749:42
REF AFL 920
VVO. Al CHECK VP-8BJ FEB. 2013. VP-BBJ MONTHLY APR.2014. VP-BBJ MONTHLY MAY13
+ 347101 UPDATE NAV DATABASE
MOS 27-MAY-2014 25-JUN-2014 M CC<
HRS/MSC DUE 3743:34
REF AFL 917
WO: Al CHECK VP-88J FEB. 2013. AMAC ADDITIONAL REQUEST OCT.. 8VBBJ007 - DUE CARDS * MONTHLY. VP-BBJ DUE LIST JULY 2014. VP-BBJ DUE TASKS DEC 2013. VP-BBJ MONTHLY
APR.2014. VP-BBJ MONTHLY JUNE 2014. VP-BBJ MONTHLY MAY13, VP-BBJ MX DUE JAN. 2014
FAA 2005-18-23 CORROSION PROTECTION OF THE ELECTRICAL CONNECTORS IN THE MAIN WHEEL WELL MANDATORY
MOS 12 03-JUL-2013 03-JUL-2014 CC<
HRS:MSC 3723:21
REF AD AFL 908
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
3 Of 79
EFTA01190603
qmp AL,iariost frum thvgriramd up*
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
FAA 2006-21-01 PART FLIGHT CONTROLS - AILERON AND AILERON TRIM CONTROL SYSTEM - REPETATIVE LUBRICATION MANDATORY
2
MOS 12 03-JUL-2013 03-JUL-2014 ccc
HRSMSC 4000 3723:21 7723:21 Mi70:02
REF AFL 908
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
FAA 2011.27-03 PARA LUBRICATE TO PREVENT AN UNDETECTED FAILURE OF THE PRIMARY LOAD PATH FOR THE BALLSCREW IN THE MANDATORY
(G)(1)(0(2) DRIVE MECHANISM OF THE HSTA AND SUBSEQUENT WEAR AND FAILURE OF THE SECONDARY LOAD PATH IN
ACCORDANCE SERVICE BULLETIN 737-27A1277 R2
MOS 12 03-JUL-2013 03-JUL-2014 c.c.<
HRSMSC 1600 3723:21 5323:21 1570:02
REF AD AFL 908
YVO. VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014
FAA 2014-08.11 LUBRICATE THE LEFT MLG FORWARD TRUNNION PINS MANDATORY
(PARA G) (LEFT)
DAYS 30 (EFF) 03-JUL-2014 <<<
HRS/MSC
REF AFL
WO VP-BBJ DUE LIST JULY 2014
FAA 2014-08-11 LUBRICATE THE RIGHT MLG FORWARD TRUNNION PINS MANDATORY
(PARA G) (RIGHT)
DAYS 30 (EFF) 03-JUL-2014 <<<
HRSMSC
REF AFL
WO: VP-BBJ DUE UST JULY 2014
+ 050020 A-2 CHECK
MOS 12 03-JUL-2013 03-JUL-2014 <<.<
HRSMSC 3723:21
REF AFL 908
WO: VP-BBJ 2A JUNE 2013. VP-BBJ C CHECK JULY 2014
(xEXT) - Extension Incorporated in the next due (s) - Suppressed Requirement + - FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement) H - Task also due In hours due list
0 CAMP SYSTEMS
0 Of 79
EFTA01190604
qp
m Ari•liorsfrum Metres:Mu/1.
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MO5. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
050060 MONTHLY CHECK
MOS 1 13-JUN-20I4 09-JUL-2014 CC<
HRS.MSC 3749:42
REF AFL 920
WO: Al CHECK VP-88J FEB. 2013. AMAC ADDITIONAL REQUEST OCT.. VP-BBJ 2A JUNE 2013. VP-BBJ C CHECK JULY 2014. VP-BBJ MONTHLY APR.2014. VP-BBJ MX DUE JAN. 2014
H + 29.230-00 OPERATIONAL CHECK STANDBY RUDDER SYSTEM TO INCLUDE OBSERVING LOW PRESSURE LIGHT ILLUMINATION
AND THEN EXTINGUISHING.
29.480 DAYS 150 12-FEB-2074 12-JUL-2014 ccc
HRSiMSC 1000 3743:34 4743:34 990:15
REF ETC 29-230-00-01 AFL 917
WO: VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014. VP-BBJ MX DUE JAN. 2014
FAA 2009.12-06 ENSURE THAT THE FLIGHTCREW IS ABLE TO TURN OFF ELECTRICAL POWER TO IFE SYSTEMS AND OTHER MANDATORY
NON-ESSENTIAL ELECTRICAL SYSTEMS THROUGH A SWITCH IN THE FLIGHT COMPARTMENT
MOS 60 (EFF) 16-JUL-2014 <CC
HRS/MSC
REF AD AFL
WO: VP-BBJ DUE LIST JULY 2014
24-120-00 (001.1) RESTORE MAIN BATTERY RESTORE
24.240 P/N: 539CH-1 MOS 6 23-JAN-2014 23-JUL-2014 <CC
S/N: 090520010322D HRS/MSC
REF BTC 24-120-00-01 AFL
WO. Al CHECK VP-88J FEB. 2013. VP-BBJ DUE CARDS JUNE 2013. VP-88J DUE LIST JULY 2014. VP-88J MX DUE JAN. 2014
24-120-00 (002.1) RESTORE AUXILIARY BATTERY RESTORE
24.240 P/N: 539CH-1 MOS 6 23-JAN-2014 23-JUL-2014
S/N: 09052000364D0 HRS/MSC
REF BTC 24-120-00-01 AFL
WO: Al CHECK VP-88J FEB. 2013. W-BBJ DUE CARDS JUNE 2013. VP-88J DUE LIST JULY 2014. VP-88J MX DUE JAN. 2014
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement +- FAA manual flag is set (EBY) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement) H - Task also due In hours due list
CAMP SYSTEMS
5 Of 79
EFTA01190605
qmp Aviaries. frum thvgriramd up'
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
) AFH
TIME REMAINING
+ 050030 C-1 CHECK
MOS 36 29-AUG-2011 09-AUG-2014 4d 09-AUG-2014
HRSMSC 35.33:32
REF AFL 863
WO: VP-BBJ C CHECK JULY 2014
25.60-00 GENERAL VISUAL INSPECTION OF ALL COCKPIT / CABIN EMERGENCY EQUIPMENT
MOS 12 09-AUG-2014 M 4d 09-AUG-2014
HRSMSC
REF AFL
+ 050010 A-1 CHECK
MOS 6 12-FEB-2014 12-AUG-2014 7d 12-AUG-2014
HRS/MSC 3743:34
REF AFL 917
WO Al CHECK VP-88J FEB. 2013. VP-613J 2A JUNE 2013. VP-BBJ C CHECK JULY 2014, VP-BBJ MX DUE JAN. 2014
256323 (001.1) OPERATIONAL CHECK OF THE NO. 1 FORWARD EMERGENCY FLASHLIGHT
P/N: P2-07-0001-101 MOS 6 12-FES-2014 12-AUG-2014 7d 12-AUG-2014
S/N: N/SN HRSMSC 3743:34
REF AFL 917
WO: Al CHECK VP-BBJ FEB. 2013. VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014. VP-BBJ MX DUE JAN. 2014
256323 (002.1) OPERATIONAL CHECK OF THE NO. 2 FORWARD EMERGENCY FLASHLIGHT
P/N: P2-07-0001-101 MOS 6 12-FEB-2014 12-AUG-2014 7d 12-AUG-2014
S/N: SN-UNKNOWN HRSMSC 3743:34
REF AFL 917
WO: Al CHECK VP-BBJ FEB. 2013. VP-BBJ DUE CARDS JUNE 2013. VP-BBJ DUE LIST JULY 2014. VP-BBJ MX DUE JAN. 2014
256323 (003.1) OPERATIONAL CHECK OF THE NO. 1 COCKPIT FLASHLIGHT
P/N: UNKNOWN MOS 13 12-FEB-2014 12-AUG-2014 7d 12-AUG-2014
S/N: NSN HRS/MSC 3743:34
REF AFL 917
WO: Al CHECK VP-B8.1FEB. 2013. VP-BBJ DUE CARDS JUNE 2013, VP-BBJ DUE LIST JULY 2014, VP-BBJ MX DUE JAN. 2014
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement +- FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
6 Of 79
EFTA01190606
qmp Ari•liorsfrum therm:ad up'
Due List
737-72UBJ REVISION 21 S/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
256323 (004.1) OPERATIONAL CHECK OF THE NO. 2 COCKPIT FLASHLIGHT
P/N: PN-UNKNOWN MOS 6 12-FEB-2014 12-AUG-2014 7d I2-AUG-2014
S/N: SN-UNKNOWN HRSMSC 3743:34
REF AFL 917
WO: Al CHECK VP-88J FEB. 2013. VP-B8J DUE CARDS JUNE 2013. VP-8BJ DUE LIST JULY 2014. VP-8BJ MX DUE JAN. 2014
256323 (005.1) OPERATIONAL CHECK OF THE NO. 1 AFT EMERGENCY FLASHLIGHT
P/N: P2-07-0001-101 MOS 6 12-FEB-2014 12-AUG-2014 7d I2-AUG-2014
S/N: SN-UNKNOWN HRSMSC 3743:34
REF AFL 917
WO: Al CHECK VP-88J FEB. 2013. VP-BBJ DUE CARDS JUNE 2013. VP-8BJ DUE LIST JULY 2014. VP-88J MX DUE JAN. 2014
256325 (003.1) OPERATIONAL CHECK OF THE CARGO NET
P/N: 453A1810-13 MOS 6 12-FEB-2014 12-AUG-2014 7d I2-AUG-2014
S/N: N/SN HRSMSC 3743:34
REF AFL 917
WO. Al CHECK VP-88J FEB. 2013. VF-B8J DUE CARDS JUNE 2013. VP-8BJ DUE LIST JULY 2014. VP-88J MX DUE JAN. 2014
33.5140 DEEP CYCLE ALL EMERGENCY BATTERIES
MOS 3 12-MAY-2014 12-AUG-2014 7d 12-AUG-2014
HRSMSC 3743:34
REF AFL 917
WO. Al CHECK VP-88J FEB. 2013. VF-B8J DUE CARDS JUNE 2013. VP-8BJ MX DUE JAN. 2014
+ 34-BBJ-01 SERVICE HEADS UP DISPLAY OVERHEAD UNIT DESICCANT CAPSULE
34.452 MOS 3 12-MAY-2014 12-AUG-2014 7d I2-AUG-2014
HRSMSC 3743:34
REF BTC 34-88J-01-Ill AFL 917
WO. Al CHECK VP-88J FEB. 2013. AMAC ADDITIONAL REQUEST OCT.. VP-BBJ DUE CARDS JUNE 2013. VP-BBJ MX DUE JAN. 2014
347105 (1) BIANNUAL CHECK EGPWS TERRAIN DATABASE VERSION STATUS
MOS 6 12-FEB-2014 12-AUG-2014 7d 12-AUG-2014
HRS/MSC 3743:34
REF AFL 917
WO: Al CHECK VP-88J FEB. 2013. W-BEIJ DUE CARDS JUNE 2013. VP-88J DUE LIST JULY 2014. VP-88J MX DUE JAN. 2014
(xEXT) - Extension incorporated in the next due (s) - Suppressed Requirement - FAA manual flap Is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
7 Of 79
EFTA01190607
qmp Ari•lionfrum tfir gmnndup
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: OS-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH ) AFH TIME REMAINING
+ 252501 VISUALLY CHECK FORWARD ENTRY DOOR EMERGENCY ESCAPE SLIDE PRESSURE BOTTLE FOR PROPER
PRESSURE
PIN: 5A3086-301 MOS 2 14-JUN-2014 14-AUG-2014 9d 14-AUG-2014
SIN: 83F476 HRS/MSC 3749:42
REF BTC 25-250-00-01 AFL 920
•
WO: Al CHECK VP-88J FEB. 2013. 8VBELI007 - DUE CARDS + MONTHLY. VP-88J DUE CARDS JUNE 2013, VP-88J MONTHLY APR.2014, VP-88J MX DUE JAN. 2014
+ 252502 VISUALLY CHECK FORWARD SERVICE DOOR EMERGENCY ESCAPE SLIDE PRESSURE BOTTLE FOR PROPER
PRESSURE
P/N: 5A3086-301 MOS 2 14-JUN-2014 14-AUG-2014 90 14-AUG-2014
S/N: 83F481 HRS/MSC 3749:42
REF BTC 25-250-00-01 AFL 920
•
WO: Al CHECK VP-88J FEB. 2013. 8VBBJ007 - DUE CARDS + MONTHLY. VP-8BJ DUE CARDS JUNE 2013. VP-88J MONTHLY APR.2014. VP-88J MX DUE JAN. 2014
+ 252503 VISUALLY CHECK AFT ENTRY DOOR EMERGENCY ESCAPE SLIDE PRESSURE BOTTLE FOR PROPER PRESSURE
P/N: 5A3088-301 MOS 2 14-JUN-2014 14-AUG-2014 9d 14-AUG-2014
S/N: 83A333 HRS/MSC 3749:42
REF BTC 25-250-00-01 AFL 920
WO: Al CHECK VP-88J FEB. 2013. 8VBB1007 - DUE CARDS + MONTHLY. VP-8BJ DUE CARDS JUNE 2013. VP-88J MONTHLY APR.2014. VP-88J MX DUE JAN. 2014
+ 252504 VISUALLY CHECK AFT SERVICE DOOR EMERGENCY ESCAPE SLIDE PRESSURE BOTTLE FOR PROPER PRESSURE
P/N: 5A3088-301 MOS 2 14-JUN-2014 14-AUG-2014 9d id-AUG-201a
S/N: 83A315 HRSAISC 3749:42
REF BTC 25-250-00-01 Aft 920
WO: Al CHECK VP-8BJ FEB. 2013. 8VB81007 - DUE CARDS + MONTHLY. VP-8BJ DUE CARDS JUNE 2013. VP-88J MONTHLY APR.2014. VP-88J MX DUE JAN. 2014
+ 262901 WEIGHT CHECK COCKPIT PORTABLE FIRE EXTINGUISHER BOTTLE
P/N: 898052 MOS 18 14-FEB-2013 14-AUG-2014 90 14-AUG-2014
S/N: X-841371 HRS/MSC
REF AFL
WO: Al CHECK VP-88J FEB. 2013. W-BBJ DUE LIST JULY 2014
(xEXT) - Extension incorporated in the next due (a) - Suppressed Requirement +- FAA manual flag is set (EBT) - Estimated Base Time (EFF) - Effective CM
• - Estimated Due (applies to New Requirement)
CAMP SYSTEMS
8 Of 79
EFTA01190608
qmpAviaries. frum thvgriramd up*
Due List
737-72UBJ REVISION 21 5/N 29273 (YG006) (VP-BBJ): 3753:19 HRS, 922 AFL as of 30-Jun-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05•AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
(Elm) AFH TIME REMAINING
+ 262902 WEIGHT CHECK ENTRANCE WAY PORTABLE FIRE EXTINGUISHER BOTTLE
P/N: 898052 MOS 18 14-FEB-2013 14-AUG-2014 9d 14-AUG-2014
SiN: X402285 HRSMSC
REF AFL
WO: Al CHECK VP-BEU FEB. 2013. VP-BELI DUE LIST JULY 2014
+ 262903 WEIGHT CHECK GALLEY PORTABLE HALON FIRE EXTINGUISHER BOTTLE
P/N: 898052 MOS 18 14-FEB-2013 14-AUG-2014 9d 14-AUG-2014
SiN: X-841372 HRSMSC
REF AFL
WO: Al CHECK VP-BEU FEB. 2013. VP-BEU DUE LIST JULY 2014
262904 WEIGHT CHECK MID CABIN PORTABLE HALON FIRE EXTINGUISHER BOTTLE
P/N: 898052 MOS 18 14-FEB-2013 14-AUG-2014 9d 14-AUG-2014
SiN: X-840288 HRSMSC
REF AFL
WO: Al CHECK VP-BBJ FEB. 2013. VP-813J DUE LIST JULY 2014
25.390.00 REPLACE THE EMERGENCY FLASHLIGHT (NON-RECHARGEABLE) BATTERIES AT THE MANUFACTURER'S
RECOMMENDED INTERVAL.
25.421 MOS 24 17-AUG-2012 17-AUG-2014 12 d 17-AUG-2014
HRS:MSC 3655:09
REF BTC 25-390-00-01 AFL 888
WO VP-BBJ DUE LIST JULY 2014
+ 33-020-00 OPERATIONAL CHECK FLIGHT DECK EMERGENCY LIGHTING SWITCH "OW AND "ARMED" POSITION AND
ATTENDANT PANEL EMERGENCY LIGHTING SWITCH "ON" POSITION.
33.160 MOS 24 17-AUG-2012 17-AUG-2014 12 d 17-AUG-2014
HRSMSC 3655:09
REF See Workcard AFL 888
WO: VP-BBJ DUE UST JULY 2014
(xEXT) - Extension incorporated in the next due (s) Suppressed Requirement + FAA manual flag is set (EBT) - Estimated Base Time (EFF) -Effective CM
' - Estimated Due (applies to New Requirement)
0 CAMP SYSTEMS
9 Of 79
EFTA01190609
qmp
A,,iatiostfrum thvgrwend up'
Due List
737-72UB3 REVISION 21 5/N 29273 (YG006) (VP-BEU): 3753:19 HRS, 922 AFL as of 30-3un-2014
Calendar Section
Projected To: 60 MOS. to 05-AUG-2019
Operator: PICTON II LTD. Report Date: 05-AUG-2014
TASK NO TASK DESCRIPTION UNIT INTERVAL TIME SINCE COMPLIANCE NEXT DUE MAX LIMIT DISPOSITION EST. DUE
I ENH) TIME REMAINING
FAA 2011-14-08 PARA RECORD TO DETERMINE IF ANY OXYGEN MASK ASSEMBLY PART NUMBER LISTED IN B/E AEROSPACE SERVICE MANDATORY
(G) BULLETIN 174080.35-04, REV 000, DATED SEPTEMBER 6, 2010, IS INSTALLED IN THE AIRCRAFT
MOS 36 (EFF) 19-AUG-2014 1
Entities
0 total entities mentioned
No entities found in this document
Document Metadata
- Document ID
- 0218279e-285c-4d88-a6c1-5e6dbec32869
- Storage Key
- dataset_9/EFTA01190601.pdf
- Content Hash
- d8a56b5fe23d545baba61759eb88fe86
- Created
- Feb 3, 2026