Epstein Files

EFTA00804922.pdf

dataset_9 pdf 291.3 KB Feb 3, 2026 1 pages
ABSOLVE HARDWOOD CHANGE ORDER AGREEMENT FLOORING HBRK Associates Inc. October 12. 2018 575 Lexington Avenue 4th Floor New York, NY 10022 tel 212-971-1306 fax 212-320-0381 Re: Little St. James Install Description: Adhere a 90 mil membrane, which reduces moisture vapor transmission, water intrusion and sound reduction, to the concrete subfloor. Mechanically fasten a 3/4" CDX plywood to the membrane covered concrete subfloor. Adhere Oak plank to the plywood subfloor. Room to be covered is the pool cabana bathroom. Sand & Finish Description: Sand Oak plank coarse, medium and fine as necessary, stain to match approved sample and finish with commercial grade urethane. Rooms to be covered include the cabana 1 bedroom and bathroom, cabana 3 bedroom and bathroom, cabana 4 bedroom and bathroom, and the pool cabana bathroom. At owner's discretion, damaged boards are to be replaced on a time and materials basis. We assume the wear layer is sufficient to sand. Job Estimate: $ 15,470.00 Notations: I. We assume the suhflonr provided for us to he smooth, flat to meet industry tolerances of ¶4" variance over a 10' span, clean and dry. Any flattening ofsubfloor to be done on a time and materials basis. 2. Finished floor height is proposed to be I 3/ 4" from a flat/level substrate. 3. Customer understands and accepts that there may be a visible difference in color tone and sheen level between newly refinished flooring and existing flooring 4. Furniture, furnishings, appliances. etc. to be removed by others prior to start date. 5. We assume the wear layer is sufficient to sand 6. It is recommended that the baseboards, casings, and/or plinth blocks be installed after the flooring. 7. Although AHF will use reasonable and prudent measures to limit wood dust, it will be necessary for a final dust clean-up after our scope of work. 8. Although AHF will be careful not to damage any of the adjacent painted surfaces, it is likely that there will be some required touch-up painting after our scope of work. 9. Due to the availability of the flooring material. estimate is valid for 30 days. After 30 days. estimate is subject to change 10. Proposal does not include any permit fees or security deposits. II. Failure to pay complete contract total voids all warranties i.e. (all warranties expressed or implied). 12. No weekend/holiday work is included in contract price, If weekend/holiday work is required. there will be a schedule expedition charge to be added on an hourly basis Signature of Representative Signature of Customer 1241-B OLD OKEECHOBEE ROAD • WEST PALM BEACH, FL 33401 • (561) 833-5720 • FAX (561) 833.5431 EFTA00804922

Entities

0 total entities mentioned

No entities found in this document

Document Metadata

Document ID
0063f3dc-be74-4c28-9332-f7a74fd647cf
Storage Key
dataset_9/EFTA00804922.pdf
Content Hash
e01f95cd5ad3615a858a6aa0bad60ab2
Created
Feb 3, 2026